Search Documents

Sort by

  • DFI
    Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure

    By Jakub Szary

    Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel

    Sep 1, 2022

  • AIME
    Geotechnical Monitoring Of High-Level Nuclear Waste Repository Performance

    By Christopher M. St. John, Michael P. Hardy

    The paper discusses an approach to geotechnical monitoring of a geological repository constructed for the purpose of isolation of high-level nuclear waste, and describes the conceptual framework for d

    Jan 1, 1982

  • SME-ICGCM
    Geotechnical Monitoring of Rock Mass and Support Behaviour around the UCG Georeactor: Two Case Studies in Polish Coal Mining Industry

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Sylwester Rajwa, Aleksander Wrana

    "Underground coal gasification (UCG) provides a solution to supply electricity from high ash coal or deep deposited seams. The coal is consumed in situ, and, accordingly, the ash is left underground.

    Jan 1, 2017

  • CIM
    Geotechnical monitoring of tunnel boring machine drivages at the Donkin-Morien Mine, Nova Scotia

    By T. R. C. Aston, C. M. K. Yuen, J. L. Gilby

    "The access tunnels for the Donkin-Morien Mine in Cape Breton, Nova Scotia, comprise two parallel tunnels driven through a sedimentary sequence of sandstone, siltstone and mudstone to intersect the Ha

    Jan 1, 1988

  • SAIMM
    Geotechnical parameters characteristics for a kind of schist in Iran

    By A. Fahimifar, H. Soroush

    Abstract: Triaxial tests were conducted on the schist specimens with various anisotropic angles under confining pressures of 0, 7 and 15 MPa, and axial stress-axial strains, were measured and plot

    Jan 1, 2003

  • SME
    Geotechnical Performance Of A Large Machine-Bored Precast Concrete Lined Tunnel

    By Edwin A. Blackey, Joseph G. Engels, James T. Cahill

    An extensive geotechnical instrumentation program was undertaken during the construction of a 6.7 m (22 ft) inside diameter tunnel to monitor the ground-structure response and to check assumptions mad

    Jan 1, 1981

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME
    Geotechnical Program At Bridger Coal Company

    By H. Maleki

    Interwest Mining Company has been collecting geologic data within the last decade in preparation for underground mining of extensive coal reserves in its Bridger Coal property in southwestern Wyoming.

    Jan 1, 2008

  • SME
    Geotechnical Properties Of Ashes From Lignite Combustion Stored With Dump Soil In Open Pit Excavations

    By J. Nowak

    Polish power industry is based on brown and hard coal combustion and transferring the heat into electric power. Over 99% of lignite is used as a fuel in power plants. Lignite is mined on in open pits.

    Jan 1, 2006

  • SAIMM
    Geotechnical properties of the northern KwaZulu-Natal coastal sand dunes, South Africa

    By E. M. Bloomfield, C. A. Jermy

    Geotechnical tests were carried out within an area of the coastal sand dune cordon of northern KwaZulu-Natal which is currently being exploited through mining of heavy mineral sands. In situ and labor

    Jan 1, 2003

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • SAIMM
    Geotechnical risk assessment of an underground magnesite mine

    By T. Frömmer, H. Wagner

    An inter-disciplinary geotechnical study has been carried out in an Austrian magnesite mine. The paper describes the how geological data, in situ and laboratory tests as well as subjective, empirical,

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar Mining

    By Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady

    "A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou

    Jan 1, 2015

  • CIM
    Geotechnical Risks Affecting Pipelines - The Bolivia-Brazil Natural Gas Pipeline Experience

    By H. R. Oliveira, C. R. Aragonez de Vasconcellos

    Pipeline operation and maintenance necessarily involves geotechnical studies at points and areas with deflagrated instabilities or still to map and monitor areas prone to geotechnical problems. Landsl

    Jan 1, 2005

  • SAIMM
    Geotechnical Rock mass Evaluation of Givi Damsite, (Case study, Ardabil-Iran)

    By R. Ajalloian, L. Karimzadeh

    This paper describes the engineering properties of Givi dam foundation. Givi dam will be built across the Givi River on the andesitic rocks (Karaj formation) in Ardabil province (northeast of Iran). G

    Jan 1, 2003

  • AUSIMM
    Geotechnical Shaft Reconciliation at Oyu Tolgoi, Mongolia

    By A Purvee, M F. Lee, L J. Mollison

    Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish

    Jan 1, 2008

  • AIME
    Geotechnical Site Investigation

    By John D. Welsh

    Jan 1, 1985

  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • SME
    Geotechnical Software Evolution And Integration, A Perfect Fit For Mine Monitoring

    By J. Tavares

    It is no mystery why the mining industry has such lofty safety standards. In dealing with Mother Nature and gravity, the combination of the two can create significant hazards from high wall and tunne

    Feb 23, 2014