Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geotechnical Challenges in Cave Monitoring – a Modern Approach
By A Jäger, J L. Lett, J Rachocki and B Mobilio
The Newcrest Mining Limited Cadia East Panel Cave mines near Orange, New South Wales, Australia commenced production 1200 m below the surface in May 2014. Understanding the mine-wide impact caving had
May 9, 2016
-
Geotechnical Challenges in Narrow Vein Mining
By J Hadjigeorgiou
Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o
Mar 26, 2012
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Characterization and 3D Modelling of the Biologically Cemented Mandena Heavy Mineral Sand Deposit - A Case Study
By F. Hees, A. H. Bracken, L. I. Boshoff
"Biological cementation of the Mandena heavy mineral sand deposit in Madagascar was causing difficulty in dredge mining and hence in planning and control of production rates. An investigation was init
Jan 1, 2017
-
Geotechnical Characterization For Caisson Sinking In Medium Stiff Clay
By Michael S. Robinson, Serge Moalli
Construction of the CSO Retention - Treatment Tunnel, Segment 1 in Dearborn, Michigan includes excavation for an overflow Structure with a minimum inside diameter of 15.24 m (finished). The excavation
Jan 1, 1995
-
Geotechnical Conditions and TBM Selection for the Bay Tunnel
By Luke Erickson
San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f
Jan 1, 2008
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams
By Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine
By Adrian L. Moodie
Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.
Jan 1, 2011
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project
By Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon
By Nick D. Rose
The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,
May 1, 2002
-
Geotechnical Considerations In Coal Mine Planning And Design ? Introduction
By Madan M. Singh
Increasingly, geotechnical data are being collected for various types of coal development projects. In many cases, a specific design concern is addressed. However, many data collection programs are no
Jan 1, 1985
-
Geotechnical Considerations in Highwall Mining Applications in Indonesia
By Takashi Sasaoka, Hiroshi Takamoto, Kikuo Matsui, Hideki Shimada
"Indonesia is the second largest coal exporter to Japan. Almost all the coal is produced from open cut mines. However, a great deal of coal is left in the highwalls of the mined-out pits. The use of h
Jan 1, 2010
-
Geotechnical Considerations In Nuclear Power Plant Construction And Licensing ? Introduction
By James W. Mitchell
On December 2, 1942, a scientific team lead by Nobel Prize winner Enrico Fermi first initiated and controlled a self-sustaining nuclear chain reaction. This historic event occurring beneath the stands
Jan 1, 1974
-
Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No. 3 Shaft
Konkola No 3 shaft experienced severe mining-induced stress and time-related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow
Jan 1, 2005
-
Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.
By M Lipalile, A B. Tunono, A W. Naismith
Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow
Jan 1, 2005
-
Geotechnical Considerations In Underground Coal Gasification
By J. M. Avasthi
Gulf Research & Development Company conducted the nation's first underground coal gasification test in steeply dipping beds near Rawlins, Wyoming. The geotechnical considerations played a major r
Jan 1, 1981
-
Geotechnical Considerations in Underground Coal Gasification (b0daa032-49f3-4f12-ab84-34160644e033)
By J. M. Avasthi
The DOE-funded (Contract No. DE-ACO3-77ET13108) Gulf Research & Development Co. (GR&DC) field tests of underground coal gasification in steeply dipping beds (UCG/SDB) were conducted in the North Knobs
Jan 1, 1984
-
Geotechnical Considerations No. 7 Subway Line Extension Project in New York City
By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro
Jan 1, 2005
-
Geotechnical Constraints On A 6 M Single Pass Longwall
By Ross W. Seedsman
The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi
Jan 1, 1992