Search Documents

Sort by

  • ABM
    Filtros Magnéticos Produzidos Com Nanopartículas De Mnfe2o4 Utilizando Freeze Casting*

    By Beatriz Luberiaga Bezerra, André Ben-Hur da Silva Figueiredo, Leticia dos Santos Aguilera, Ana Carolina Accioly Monteiro, Thainá Lucciola Hipolito de Lima, Barbara da Costa Araujo, Ana Luiza Buse da Silva

    Cerâmicas porosas foram produzidas com nanopartículas de ferrita de manganês através da técnica de freeze casting, sendo possível obter poros direcionados. Foram produzidas duas amostras dessas cerâmi

    Mar 1, 2019

  • AUSIMM
    Fimiston Open Pit

    By Neill A, O&apos

    The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim

    Jan 1, 1991

  • AIME
    Final Adjourned Annual Business Meeting.

    By AIME AIME

    The following abstract of the minutes of the final Adjourned Annual Business Meeting, held Nov. 12, 1912, in the office of the Institute, 29 West 39th Street, New York City, is here presented for the

    Dec 1, 1912

  • SME
    Final Design of the River Des Peres Tunnel in St. Louis, MO

    By Patricia Pride, Mike Robison, Jon Bergenthal, Wojciech Klecan

    "The Lower and Middle River Des Peres (LMRDP) CSO Storage Tunnel is the largest single component of Metropolitan St. Louis Sewer District’s (MSD) CSO control system improvements planned to meet consen

    Jun 1, 2019

  • SME
    Final Lining At Devil?s Slide Tunnel

    By Stephen Liu

    Tunnel excavation while mining is not often performed in North America primarily due to access constraints in both operations. Referencing European approaches for long distance tunneling, the Devil?s

    Jan 1, 2011

  • SME
    Final Lining Construction of a SEM Cavern–Regional Connector Transit Project - RETC2021

    By Christophe Bragard, Rebecca Reeve

    The Regional Connector Transit Corridor (RCTC) Project is a 1.9-mile-long metro light-rail extension project that traverses the historical core of downtown Los Angeles, California. This project aims t

    Jun 13, 2021

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • CIM
    Final recovery at Inco's Little Stobie Mine: A case study

    By S. Espley, G. Tan

    "Inco's Little Stobie Mine is a low-grade nickel operation producing approximately 4()()() tons per day. Backfill has never been an economical option at the mine; therefore, the only viable type

    Jan 1, 1994

  • NIOSH
    Final Report Of Investigation To The Diesel Emissions Evaluation Program (Deep) - Noranda Inc. - Brunswick Mine - Diesel Particulate Filter (DPF) Field Study ? Executive Summary ? About the Project

    By S. McGinn

    The Brunswick Mine Diesel Particulate Filter Study was one of several research projects initiated by the Diesel Emissions Evaluation Program (DEEP). The study was carried out at Noranda?s Brunswick Mi

    Jan 1, 2004

  • NIOSH
    Final Report Of The Technical Study Panel On The Utilization Of Belt Air And The Composition And Fire Retardant Properties Of Belt Materials In Underground Coal Mining - Executive Summary

    The Technical Study Panel on the Utilization of Belt Air and the Composition and Fire Retardant Properties of Belt Materials in Underground Coal Mining (hereafter referred to as the Panel or the TSP)

  • DFI
    Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun

    Jan 1, 2016

  • ISEE
    Final Rock Slope Blasting Techniques: Considerations in Design and Execution

    By Michael F. Barber

    "Highway slopes are intended to remain stable over a long period of time. Unexpected slope failures can be costly in terms of human life and property damage or loss. Cleanup of failures can prove to b

    Jan 1, 1999

  • AUSIMM
    Final Session

    The seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res

    Jan 1, 1973

  • SME
    Final Stage Of Store B?lt Railway Tunnel - Summary And Appraisal -

    By Siegfried Zell

    INTRODUCTION Denmark is a small country with a population of about 5.5 million in the north of Europe. A substantial part of Denmark consists of islands, and the Danes have been familiar with ferry

    Jan 1, 1995

  • SME
    Final Subsidence Basin

    By W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng

    2.1 INTRODUCTION When total extraction of an opening of sufficient size is reached in a horizontal coal seam, the roof strata in the overburden deform continuously to reach a new equilibrium conditi

    Jan 1, 1992

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New York

    By Peter S. Schneidkraut

    This paper will discuss the Final Tunnel Linings which were placed in 6700m of a 2.32m inside diameter precast concrete lined interceptor sewer tunnel in Staten Island, New York. Two methods were empl

    Jan 1, 1993

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    Finance

    "In the first half of 1990, Cambior earned $1104 million, or $0.37 per share, on revenues of$66.4 million. The company's strong cash position, attained late in 1989 and in the beginning of1990 th

    Jan 1, 1990