    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • AIME
    Driving The Oso Tunnel With A Mechanical Mole

    By Victor L. Stevens

    The Oso tunnel is one of three tunnels located on the San Juan-Chama Project in south-central Colorado. The purpose of the tunnel is to carry water from the upper San Juan watershed through the Contin

    Jan 1, 1970

  • AUSIMM
    Driving the transformation to hydrogen ironmaking – an experimental vertical shaft H2-DRI reactor facility in NZ

    By M McCurd, M Lynch, B H. Yin, S Mendoza, C W. Bumby, Y Iwasaki, B Rumsey

    Iron and steel production is responsible for approximately 6.3 per cent of global anthropogenic CO2 emissions. Direct reduction of iron with hydrogen is a potential route for decarbonising the iron an

    Sep 18, 2023

  • SME
    Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project

    By Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen

    Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project

    Jan 1, 2007

  • AUSIMM
    Driving Through Broken Ground. Standard Method Adopted at Central Mine, Broken Hill

    Owing to the 'creeps' and consequent movements in the mines, followed by the recent fire in the southern workings, the whole of the orebody above the 800 ft. level is now very much crushed

    Jan 1, 1932

  • SME
    Driving Workings By Continuous Liners In Explosible Seams

    By V. Y. Kirillin, V. A. Rumjantsev, S. A. Tchesnokov, Yu A. Veksler, V. F. Kalmykov, A. N. Telgarin, A. T. Shakirov

    Mining in outburst hazard seams may be safe and effective if some preventive measures, such as lowering gas and rock pressure as well as speed regulating of a continuous miner in cutting the seam woul

    Jan 1, 1985

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • SME
    Drone-Based Applications for Tailings Dam Monitoring

    By Jose A. Gomez, Javad Sattarvand

    Failures of tailings dams have been happening lately. Due to the lack of laws on particular design criteria and stability requirements related monitoring during construction and maintenance, they are

    Jun 25, 2023

  • SME
    DRONE-BASED APPLICATIONS FOR TAILINGS DAM MONITORING - SME Annual Conference 2023

    By J. A. G. Llerena, J. Sattarvand

    Tailings dam failures have been occurring in recent years. They are considered more vulnerable than hydraulic dams due to the lack of regulations on specific design criteria, and stability requirement

    Feb 1, 2023

  • IIMP
    Drones: Revolución tecnológica en minería

    By Jesus Layten, Marcos Garayar

    Los RPAS (Remotely Piloted Aircraft Systems, por sus siglas en inglés) o drones son aeronaves (plataformas) que vuelan sin tripulación de manera automatizada, a las que se les puede adaptar diversos t

    Sep 20, 2019

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • AIME
    Dropball Cuts Blasting Costs at Tahawus

    By P. W. Allen

    Here are the facts and the figures on how Tahawus cut costs and improved safety in solving their secondary breakage problem - A dropball crane entirely eliminated secondary blasting.

    Jan 4, 1953

  • CIM
    Droplet Generation and Residence Time in Slag during Top Blown Oxygen Steelmaking

    By Subagyo, Geoffrey Brooks, Ken Coley

    The generation of droplets and their subsequent reaction in the emulsion is critical to the overall kinetics of oxygen steelmaking. High temperature experiments have been performed at McMaster Univers

    Jan 1, 2004

  • CIM
    Drosrite Plus™ Treatment of Aluminum and Zinc Drosses

    By F. Rivard, M. G. Drouet, W. S. Ruff, P. Carabin

    "In both the hot rotary-salt-furnace (RSF) treatment of aluminum dross and the cold ball-millsieving (BMS) treatment of zinc dross, enormous amounts of energy and recoverable metal are wasted and larg

    Jan 1, 2012

  • TMS
    Drosrite Salt-Free Processing of Hot Aluminum Dross

    By Rodney L. LeRoy, Michel G. Drouet, Peter G. Tsantrizos

    "DROSRITE is a unique process that makes possible economic in-plant recovery of metal from hot aluminum dross. It is environmentally friendly, requiring no salt and producing no C02 or NOx gases. The

    Jan 1, 2000

  • TMS
    Dross Analysis Methods and Their Application for Evaluating Secondary Furnace Operations

    By Ray D. Peterson, Annette Revet

    The optimization of secondary aluminum furnaces is critical to the efficient operation of a recycling facility. Since all metal loss occurs in the drosses, physical and chemical analyses of these by-p

    Jan 1, 2000

  • TMS
    Dross Reclamation at Aluminum Melting Furnace Sites

    By Daniel E. Groteke

    This paper describes a new technology which allows aluminum drosses to be processed at the generating melting furnace to recover available metallic values. The systems, offered in both manual and auto

    Jan 1, 2000

  • SME
    Drug screening : One company’s obstacle-filled road to a successful program

    By Jim Wilcox

    Introduction In 1979, rumors of a developing drug problem within IMC Fertilizer's Carlsbad, NM workforce began to surface. For the next two years, a management team contacted local, state, and f

    Jan 11, 1987

  • SME
    Drum Hoist Ropes - Selection And Maintenance

    By J. M. Manka

    American mining companies operate many drum hoists, hoisting from varying depths with varying payloads. This paper reviews the procedure for selecting optimum wire rope constructions for existing hois

    Jan 1, 1993

  • SME
    Drum Hoist Ropes -Selection And Maintenance (PREPRINT NUMBER 92-96)

    By J. M. Manka

    American mining companies operate many drum hoists that hoist from various depths with varying payloads. This paper will review the procedure of selecting optimum wire rope constructions for these exi