Search Documents

Sort by

  • ABM
    Development Of The Off-line Simulator Of The Hot Strip Mill Mathematical Model From Gerdau Ouro Branco*

    By Luiz Bruno de Oliveira Araujo, Luciano Morais Teixeira, Luiz Gustavo Pedrosa de Melo, Altair Lúcio de Souza

    The off-line simulation of the metallurgical process in an industrial line brings several benefits such as: evaluation of the influence of the main parameters that affect the results of the process, c

    Oct 1, 2019

  • SME
    Development Of The Operations Research Program At The College Of Mines

    By E. R. Drevdahl

    It has been suggested that we at the University of Arizona present a paper covering the origin, philosophy, and results of the College of Mines program in the field of computers and operations researc

    Jan 1, 1963

  • AUSIMM
    Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia

    By H Firdausi, I Pasek, T Chenier

    The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start produ

    May 9, 2016

  • AUSIMM
    Development of the Osborne Mine - With a Focus on Technical and Operational Aspects

    By R H. Boffey

    The Osborne copper-gold deposit was discovered in North-West Queensland in 1989. Underground production activities commenced at Osborne deposit in April 1996. This paper will examine technical and ope

    Jan 1, 1998

  • DFI
    Development Of The Osterberg Load Cell

    By Charles L. Guild

    I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p

    Jan 1, 1989

  • SME
    Development of the Outokumpu Ceramec® Pressure Filter at Outokumpu Tara Mines

    By D. O. Murchu

    Outokumpu Tara Mines located near Dublin, Ireland is Europe's largest producer of lead and zinc concentrates. To reduce dewatering costs and to improve environmental and working conditions, elimi

    Jan 1, 1997

  • AUSIMM
    Development of the Pike River Coal Mine Access Road

    By D Macfarlane, T McMorran

      This paper describes the design and construction of the upper section of the Pike River Mine Access Road. The road extends 11 km from Logburn Road alongside Big River on the West Coast of the S

    Jan 1, 2007

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New Fans

    Full aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

    Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance

    Jan 1, 1967

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • AIME
    Development Of The Ranger Uranium Financing From Banks, Customers, Shareholders, And The Stock Market

    By C. Richard Tinsley, Norman Miskelly, S. James Hodge

    Construction of the Ranger uranium project, located 230 kms east of Darwin in the Northern Territory, Australia, commenced in January 1979. Energy Resources of Australia Ltd (ERA) was incorporated in

    Jan 1, 1985

  • SME
    Development Of The Rapidex Continuous Spiral Drill And Blast Tunneler, Phase III

    By Carl R. Peterson

    The Rapidex continuous drill and blast tunneling concept utilizes a unique spiral blasting pattern that permits efficient performance with relatively small single shots, while at the same time directi

    Jan 1, 1977

  • ISEE
    Development of the Remote Controlled Blasting System for Tunnel Construction

    By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki

    A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de

    Jan 1, 1998

  • AIME
    Development of the Round Table at Great Falls

    By Arthur Crowfoot

    INTRODUCTION The principal object of this paper is to present data on the development of the revolving convex round table as a concentrator for the through 0.07-mm. slimes from the ores of the Butte

    Jan 8, 1914

  • CIM
    Development of the Salobo Project

    By Marcio Luis S. Godoy

    The Salobo Project will be the first Vale operation to use an HPGR mill to process copper-gold ore. The mine is located in Para state, southeast of the Amazon region in Brazil. The circuit was designe

    May 1, 2010