Search Documents

Sort by

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • SME
    Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project

    By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade

    This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a

    Jan 1, 2003

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • DFI
    Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah

    By Rick Deschamps

    The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake

    Jan 1, 2009

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • SME
    Design-Build: Elevating Partnering to a Higher Level

    By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring

    The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value

    Jan 1, 2003

  • CIM
    Design-By-Analysis of Water-Cooled Gas Handling Ducts

    By T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani

    "Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,

    Jan 1, 2017

  • CIM
    Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in Saskatchewan

    By Witold J. S. Ostrowski

    Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with

    Jan 1, 1967

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • ISEE
    Design/Build Highway Blasting - Case Study

    By Cathy Aimone-Martin, Frank Achuff

    The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i

    Jan 1, 2004

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SAIMM
    Design?a strategic issue - Synopsis

    A set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c

    Jan 1, 2009

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999

  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992

  • AUSIMM
    Designer Tailings – An Integrated Model for Tailings Management

    By T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig

    With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat

    Jul 16, 2014

  • TMS
    Designing a Collaborative System for Socio-Environmental Management of Industrial Waste

    By F. Baldini, M. S. Borges

    "The proposed method emphasizes the optimization of waste management with regard to the exploitation of raw materials incorporated in the remains of industry, as well as the economics of natural resou

    Jan 1, 2011