Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.
By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
Design, Materials Combinations and Recycling
By Remmerswaal, U. Boin, M. B. G. Castro
"To design sustainable products that can be recycled with high resource efficiency, low environmental impact and economic feasibility, the choice of materials and materials combinations, made in the d
Jan 1, 2003
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft
By Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Design, Modelling and Control of Flotation Equipments
By Juan B. Yianatos
"After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota
Jan 1, 2003
-
Design, Modelling and Control of Flotation Equipments ( XXII International Mineral Processing Congress)
By Juan B. Yianatos
"After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota
Jan 1, 2003
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room
By Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Design, Operation And Control Of A Teeter-Bed Hydroseparator For Classification (August 2010 • Vol. 27 No. 3)
By J.N. Kohmuench
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Operation, And Control Of A Teeter-Bed Hydroseparator For Classification
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Optimization and Transfer of a Process for Biodissolution of Precious Metals from Used Electronic Equipment
By C. Stollberg
The recovery of valuable materials from electronic waste is of growing importance for the re-source management not only in the industrialized nations. Being a significant step in an innovative automat
Jan 1, 2014
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital Structures
By Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004
-
Design, Simulation and Operation Column Flotation
By J. B. Rubinstein
"The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of
Jan 1, 2003
-
Design, Simulation and Operation Column Flotation (ABSTRACT PAGE)
By J. B. Rubinstein
"The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of
Jan 1, 2003
-
Design, Simulation and Operation of a New Generation of Column Flotation Machines
By Gerasimenko MP
The authors consider the features and advantages of a new promising trend in mineral processing - column flotation. Design aerohydrodynamic and process characteristics of pilot-scale columns are stu
Jan 1, 1993
-
Design, Specification And Installation Of Square Shaft Helical Piers In Expansive Soils
By John S. Pack
The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and
Jan 1, 2007
-
Design, Start-Up And Operation Of The Cyprus Miami Copper Refinery
By J. Garvey
The new Cyprus Miami electrolytic copper refinery was commissioned in October 1994. The refinery has been operating at its design capacity of 190,000 short tons per year, and in recent months to 110%
Jan 1, 1999
-
Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology
By Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive
By Marc C. Bétournay
A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop
May 1, 2003
-
Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive
By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté
"A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr
Jan 1, 2004
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel
By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm Sinkhole
By Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003