Search Documents

Sort by

  • SME
    Design Review Of A Rectangular Shaft In Alluvium

    By P. D. Pack, E. H. Skinner

    During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio

    Jan 1, 1977

  • AUSIMM
    Design Risk Management at Mt Leyshon Gold Mine

    The Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet

    Jan 1, 1994

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SAIMM
    Design Rules For Avoiding Draw Horizon Damage In Deep Level Block Caves

    Deep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful

    Jan 1, 1999

  • AUSIMM
    Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide Slurries

    By Hawes GW

    Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv

    Jan 1, 1988

  • AUSIMM
    Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?

    By J Hudson

    Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici

    Jan 1, 2006

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • DFI
    Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions

    By Michael Hughes, Selva Selvamohan, Ray Costa

    "Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back

    Jan 1, 2015

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • NIOSH
    Design Spans – Underhand Cut And Fill Mining (a912b9dd-cc3d-4815-9ae5-05c7be299ff3)

    By Rimas Pakalnis, Ted Williams, Tom Brady, Wilson Blake, Mary MacLaughlin, Kathryn Clapp, Cristian Caceres, Mario Morin

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

  • CIM
    Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent Developments

    By Nicolas Gatelier, Sophie Laurent, Thierry You

    Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also

    Jan 1, 2015

  • SME
    Design Strategies For Selective Flocculants

    By G. R. O?Neil

    The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i

    Jan 1, 1983

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • SME
    Design Tools for Construction Engineering

    By Scott G. Britton

    Up to now, the hands-on approach to construction has been stressed. This chapter reviews the basic tools available for construction design and monitoring of a construction project. It is divided into

    Jan 1, 1983

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixer units. However, recent experience in both large and

    Jan 1, 2003

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)

    By G. Miller

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant

    Jan 1, 2001

  • SAIMM
    Design tools to minimize the occurrence of ore pass interlocking hang-ups in metal mines

    A comprehensive review of ore pass records, from ten Quebec underground mines, indicated some of the limitations of available design tools to predict the occurrence of ore pass interlocking hang-ups i

    Jan 1, 2003

  • SME-ICGCM
    Design Trade-Off For Angle Roof Drilling

    By James H. Fletcher

    Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support

    Jan 1, 1982