Search Documents

Sort by

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Design and Installation of Helical Piles for Support of Bridge Pier Foundation

    By David L. Borusiewicz, M. Suri Surendra

    "Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc

    Jan 1, 2014

  • SME
    Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System

    By Jean-Pierre Nossereau, Allen J. Hulshizer

    The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in

    Jan 1, 1981

  • DFI
    Design And Installation Of Pressure-Grouted, Drilled Displacement Piles

    By Willie M. NeSmith

    The use of drilled (screwed) displacement piles is an emerging sector of the United States deep foundation industry. During installation of these systems, a Ko to Kp environment is created in the mate

    Jan 1, 2002

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • NIOSH
    Design And Instrumentation Of A Large Reverberation Chamber

    By Roy C. Bartholomae, Jeffrey Shawn Peterson

    1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002

  • DFI
    Design And Load Test Of Micropiles In A Power Plant In Missouri

    By Bidjan Ghahreman

    A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde

    Jan 1, 2009

  • CIM
    Design and Maintenance of Platework and Vessels in Mines

    By A. J. Paul Laprairie

    The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can

    Jan 1, 1963

  • SME
    Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope Belt

    By Rick Sarkisian, Albert D. Bonneau, David Keech

    The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200

    Jan 1, 1996

  • SAIMM
    Design and manufacturing of a teleoperated excavator platform APCOM 2021

    By M. Salimov, J. Sattarvand

    The conventional visualisation method of remote equipment is through the installation of one or more cameras on the machine, and sending a live feed to the operator’s flat display. However, the perfor

    Sep 1, 2021

  • CIM
    Design and Materials Selection of Autoclaves and Auxiliary Equipment

    By P. Cheung, J. Gulyas, R. Clary

    Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who

    Jan 1, 2004

  • SME
    Design And Operating Characteristics For Large Flotation Cells ? Historical

    By Nathaniel Arbiter

    The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f

    Jan 1, 1979

  • TMS
    Design And Operating Characteristics Of The New Olen Tank House

    By C. Geenen

    At its Olen site, Union Minière Copper operates a new full-size deposit tank house. A first 200,000 t/y module was commissioned in October 1996, and an additional 130,000 t/y unit started in April 199

    Jan 1, 1999

  • SME
    Design and Operating Considerations for the Application of a Dry Grinding and Roasting Circuit for Refractory Gold Ore

    By P. G. Semple, K. W. Major, P. Eng.

    The recent increase in development of refractory gold deposits has resulted in changes to the traditional treatment processes. The selection of the preferred refractory treatment process is dependent

    Jan 1, 1990

  • SME
    Design And Operating Experiences With Flotation Columns In China

    By Guoming Liu, Weibai Hu

    The designing aspects of column profile, cross-section and height, types of aerator or air sparger, and feeding and discharging devices have been designed and tested. In operating aspects, the flotati

    Jan 1, 1988

  • SAIMM
    Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha

    By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah

    NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco

    Jan 1, 2007

  • SME
    Design and Operating Results of the Nitrox Process ®

    By Ken J. Fair, Vicken H. Aprahamian, Gus Van Weert

    A consortium of Canadian mining companies, engineering firms and the Ontario Government has supported Hydrochem's efforts in the last year to design and cost a 10 tpd NITROX PROCESS® demonstrati

    Jan 1, 1988

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979