Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Full-Scale Testing Of The Mining Geometry In Division II Kamoto Mine
By W. Blake, J. Mahaut, W. Hustrulid
Division II at Kamoto mine in Kolwezi, Zaire represents a transition zone between Divisions I and III where transverse and longitudinal cut-and-fill rooms were being mined. Because this transition zon
Jan 1, 1977
-
Design and Geotechnical Aspects of Microtunnel Crossings Below Active Rail Alignments
By Andy J. Robinson, Mark D. Claassen
Railroad companies and transit authorities have been slow to acknowledge that for many—utility crossings, a direct pipe installation below live rail can be just as effective as a more intrusive tradit
Jan 1, 2003
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane
By Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design And Hazard Assessment Of Mine Ore Passes
By M. J. Beus
This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro
Jan 1, 1996
-
Design and Implementation of a Brownfield Sag Pre-Crush Circuit
By G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Design and Implementation of a Fully Integrated Mine Information Management System
By Thomas S. Kovach
In today's competitive energy market, every effort must be made to assure the lowest possible production cost. 'rhi s. paper describes the cooperative effort between the coal producer and th
Jan 1, 1989
-
Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? Synopsis
By E. Demir
Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe
Jan 1, 2012
-
Design and implementation of a polycarbonate safe haven wall in an underground coal mine - SME Transactions 2013
By R. A. Meyr, K. A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by the U.S.Congress. The U.S. Mining Safety and Health Administration subsequently released the Final Rule on Refuge A
Jan 1, 2013
-
Design and implementation of a process control system for column flotation
By A. LA. Salama, D. B. Hyma
"The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.
Jan 1, 1993
-
Design and Implementation of a Semi-automated Truck/Shovel Dispatching System
By Y. Lizotte
This paper describes the design and implementation of the dispatching system at LAB Chrysotile Inc.'s Black Lake Mine Operation, Quebec, Canada. The initial system uses a computer in a passive ro
Jan 1, 1987
-
Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous Mining
By J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown
"In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill
By Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design And Implementation Of An Environmental Audit Program
By Jerry W. Danni, John E. Hardaway
Corporations today must comply with an ever growing number of complex and increasingly stringent environmental laws and regulations. An environmental audit program is an effective means in which to un
Jan 1, 1992
-
Design And Implementation Of An Onoune Optimising Control System For Processing The Sadiola Hill Oxidised Gold Ore
By O. Guyot, T. Mulpeter
Sadiola Hill mine is located in the sub-Saharan part of Mali. In its first two years of operations, Sadiola Hill mine had already exceeded expectations with respect to profitability, plant capacity, m
Jan 1, 2000
-
Design and Implementation of Low Cost Measurement System for Determination of Thermal Conductivity Coefficient
By N. J. Rarmrez, C. Perez, J. D. Calderon, L. Lopez
"Among the thermal characterization of any material, one of the variables to know is the coefficient of thermal conductivity because this value can tell how much heat passes through the material and i
Jan 1, 2011
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, Sweden
By M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Design And Implementation Of New Moulds For The Casters
By Chad B. Donovan
There is a strong need in North America and other major steel producing markets where major capital investment in new equipment has been minimal over the past several years to make improvements to exi
Oct 30, 2017
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South Pit
By K Williams
Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and
Jan 1, 2003
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge
By Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi Illinois
By S. Crewdson
Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S
Jan 1, 2003