Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of Nysted Offshore Wind Farm, Denmark
By Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009
-
Design And Construction Of Open Cell Sheet Pile® Abutments Under An Existing Bridge
By Dempsey S. Thieman
The Kuparuk River Central Channel Bridge on the North Slope of Alaska provides critical access for oilfield service vehicles in the largest oilfield in the United States. The original sloped spill-th
Jan 1, 2008
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method
By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope Stabilization
By Nasr Sheta
"After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability
Jan 1, 1900
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023
By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Design And Construction Of Shafts By The Wet Method
By Safdar A. Gill
The technique of installing small diameter caissons (drilled piers) through soft clays and water bearing ganular soil is well established for constructing building foundations. Over the past few years
Jan 1, 1981
-
Design And Construction Of Shear Pins For Landslide Stabilization
By Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building
By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass
By B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Design And Construction Of Tailings Dams
By Bruce N. McIver, Leo Casagrande
Similarities are noted in the practices and problems of constructing dams to impound mine tailings, fly ash, and chemical wastes. The comparison of a typical tailings dam with a conventional water-ret
Jan 1, 1971
-
Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )
By Earle J. Klohn
"The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr
Jan 1, 1972
-
Design And Construction Of Tailings Ponds And Reclamation Facilities - Case Histories
By J. D. Jones
Unique aspects of tailing pond design aid reclamation facilities for three separate projects are described.
Jan 1, 1978
-
Design and Construction of Tailings Ponds and Reclamation Facilities - Case Histories (ClM Bulletin, October 1978)
By J. D. Jones
The geographic occurrence of economic mineral deposits presents a variety of problems in modern tailings disposal operations. This paper presents case histories in several sectors of the mineral indus
Jan 1, 1978
-
Design And Construction Of Temporary And Permanent Lining Systems For Shield Tunnels In Germany
By Heinz Distelmeier
Short Historical Review Tunnelling in Germany is as old as it is in other industrial countries. Until the middle of this century German contractors had no chance to work continuously in this busine
Jan 1, 1987
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project
By J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney
By Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Design And Construction Of The Ahmed Hamdi Tunnel
By A. C. Lyons
Foreword Sir William Halcrow and Partners are responsible for the design of the Ahmed Hamdi Tunnel as Sub-contractor to the Contractor, Osmac, a joint venture formed by the Arab Contractors, Osman
Jan 1, 1979
-
Design and Construction of the Backfilled Pit Cover System at Whistle Mine, Canada: A Case Study
By Brian K. Ayres
Inco Limited, Ontario Division is currently in the process of decommissioning the Whistle Mine site located near Sudbury, Ontario, Canada. The most significant component of site decommissioning involv
Apr 1, 2005
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel
By Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall
By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016