Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022
By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti
Dec 1, 2022
-
Design and Construction Challenges for the North Temple Tunnel - NAT2022
By Todd Kilduff, Michael Tinney
The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En
Dec 1, 2022
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel
By Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021
By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023
By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation
By Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - Synopsis
By George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore
By R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Design and Construction Evolution of the Kemess Mine Tailings Dam
By Georgia J. Lysay
The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat
May 1, 2007
-
Design and Construction for the Widening of the M2 Norfolk Twin Tunnels
By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary
By Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland
By Keith Jones, Martin Knights, Timothy Watson
In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a
Jan 1, 2003
-
Design and Construction of a 1/40th Scale Longwall Mine Model for Physical Testing of Methane Explosions
By R. C. Gilmore, J. McMack, G. E. Bogin, J. F. Brune, C. DeRosa
"Researchers at the Colorado School of Mines are designing and building a 1:40 scaled physical model of a fully operational longwall coal mine. The purpose of the model is to minimize the occurrence o
Jan 1, 2019
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur Mine
By C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By J. F. Able, F. Djahanguiri
The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m
Jan 1, 1998
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would
Jan 1, 1997
-
Design And Construction Of A Cut-Off Wall In Warm Permafrost
By Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021
By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground
By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los