Search Documents

Sort by

  • SME
    Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By E. R. Bauer

    The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove

    Jan 1, 1999

  • SME
    Deep Cut Mining Investigation - Case Study

    By Richard Stoltz, Gary Smith

    This paper presents the findings of a face ventilation investigation, conducted by the Ventilation Division, Pittsburgh Health Technology Center, at a underground coal mine operating in the Illinois N

    Jan 1, 1991

  • SME
    Deep cut: ground control and worker safety in coal mines

    By E. R. Braer, C. J. Bise

    The trend in underground room-and-pillar coal mining is to employ remote-controlled, continuous-mining machines and extended cuts to depths of 12 m (40 ft) or more. This system of coal extraction, ado

    Jan 1, 2000

  • NIOSH
    Deep Cutting Double Arm Shearer - Objective

    Reduce the airborne dust generated in a longwall coal face. Approach Reduce the rotational speed and increase the depth-of-cut of the longwall shearer. How It Works An Anderson-Mavor AM500 d

    Jan 1, 1981

  • DFI
    Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The Netherlands

    By Klaus Pöllath

    The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri

    Jan 1, 2006

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, Connecticut

    By Theodore von Rosenvinge

    Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har

    Jan 1, 2011

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    Deep Dry Soil Mixing Performance and Quality Control Acceptance Criteria

    By Patrick K. Wong, Richard Kelly

    "The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care

    Jan 1, 2015

  • SME
    Deep Eutectic Solvents (DESs) for Green Recycling of Wasted Lithium‑Ion Batteries (LIBs): Progress on Pushing the Overall Efficiency

    By Shuie Li, Taibai Li, Tao Hu, Zhongjie Wang, Xiang Ge

    As one of the main power sources, lithium-ion batteries (LIBs) will continue to be applied on a large scale in the future market. Commercialized LIBs cathode materials contain various valuable metal e

    Jul 30, 2022

  • DFI
    Deep Excavation And Earth Retaining Structure ? Synopsis

    By S. Y. Zhou

    Excavation with earth retaining is one of the main technological means in deep foundations and underground engineerings. Several construction methods which have been used in China are introduced here

    Jan 1, 2010

  • DFI
    Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study

    By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna

    Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec

    Sep 1, 2022

  • DFI
    Deep Excavation for Loop Pit

    By Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De

    "This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t

    Jan 1, 2015

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • DFI
    Deep Excavation Retaining Systems In Unsaturated Soils

    By Tariq B. Hamid

    Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav

    Jan 1, 2006

  • DFI
    Deep Excavation Support – Shangri-La – Toronto

    By Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle

    "The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe

    Jan 1, 2015

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Deep Excavations And Foundations For Locks ? Synopsis

    By B. H. Moore

    Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f

    Jan 1, 2010

  • CIM
    Deep Exploration of the "Brunswick Horizon", Bathurst District Northern New Brunswick

    By J. J. Hussey

    "Abstract-The ""Brunswick Horizon"" an informally named ore-bearing unit near the top of the Nepisiguit Falls Formation in the Ordovician Tetagouche Group, hosts the Brunswick No. 6 and No. 12 base-me

    Jan 1, 1992