Search Documents

Sort by

  • CIM
    Data Acquisition during Ground Freezing at Thyssen Mining’s Newmont Leeville Turf #3 Ventilation Shaft Project

    By G. A. Witwicki

    "The Thyssen Mining Group of Companies has successfully applied ground freezing technology to numerous projects throughout Europe and North America for over 100 years. Recently, the aspect of data acq

    Jan 1, 2015

  • CIM
    Data Acquisition from an Industrial Zinc Flotation Circuit

    By A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda

    "The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis

    Jan 1, 1991

  • NIOSH
    Data Analysis

    By Thomas V. Falkie, R. Venkataramani

    The method of analysis was to test a large model containing potentially significant variables and on the basis of the results obtained, to reduce the model to one containing only the essential signifi

    Jan 1, 1972

  • AUSIMM
    Data analytics and machine learning methods applied to underground coalmine roof convergence data

    By I Canbulat, J Emery, L Yao and C Zhang

    This paper documents a process of data analytics and machine learning applied to coalmine roof convergence data. It follows a publication documenting the formation of the database. For each set of ana

    Nov 29, 2022

  • SME
    Data and Monitoring Systems Improve Pit Operations

    By Greg Sheppard, Eduardo Nebot

    Australian researchers have developed new technologies aimed at improving safety and productivity at openpit mines. A data acquisition and feedback system for electric rope shovels has been shown to

    Jan 1, 2002

  • AUSIMM
    Data augmentation for image-based rock fragment recognition using StyleGAN

    By Y Tang, G Si

    The analysis of rock fragment sizes plays a pivotal role in various stages of geotechnical and mining engineering. Traditional case-based methods often falter in addressing the variability in rock fra

    Sep 1, 2024

  • AIME
    Data Bank for Geologic Field Work (GEOBANK) and Extension

    By Dan Chun

    Abstract-To facilitate the efficient handling of large volumes of information generated by logging exploration drill cores, a computer data bank system (GEOBANK) has been developed to store and retrie

    Jan 9, 1978

  • AIME
    Data Base-Oriented Planning Systems-- New Challenges And Opportunities In The Mineral Industry

    By Alfred Weiss

    When I first received the announcement of this meeting I was pleased to see that this 14th APCOM Symposium had expanded its range of interest. One new topic to be considered this year is long range or

    Jan 1, 1977

  • ABM
    Data Center Para Automação

    By Márcio Aurélio dos Santos

    A Automação Industrial utiliza de forma intensiva os mesmos equipamentos e softwares de TI como servidores, historiadores, switches, firewall, dentre outros. No entanto, são poucas as áreas de automaç

    Jul 30, 2018

  • DFI
    Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges

    By Reinaldo J. Villa, Joshua C. Adams

    The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac

    Sep 8, 2021

  • NIOSH
    Data Collection

    By Thomas V. Falkie, R. Venkataramani

    The empirical nature of this investigation required measurements of variables under operating conditions in underground coal mines. The variables to be measured were based on the postulated character¬

    Jan 1, 1972

  • AUSIMM
    Data Collection and Analysis for the George Fisher Project, Mount Isa, Qld

    By S Versace, D Arnott, D Bojcevs, A Shaw

    The George Fisher deposit is a significant sediment hosted silver-leadzinc resource located 2 km north of the Hilton Mine in NW Queensland. The George Fisher feasibility project involved the completio

    Jan 1, 1998

  • AUSIMM
    Data Collection and Management in Underground Engineering

    This paper presents a new idea in field data collection for geological and scientific data. The computer keyboard has been replaced by a barcode wand driving a spreadsheet style editor. To use the ful

    Jan 1, 1993

  • CIM
    Data Communication Manager for an Intelligent Excavation System

    By Jeonghwan Kim

    Intelligent Excavation System (IES) has been considered to be one of the desirable solutions to improve the productivity, quality and safety of the current earthwork processes. IES is composed of vari

    Aug 1, 2013

  • TMS
    Data Corrections in Two-Dimensional Liberation Studies

    By G. S. Hill

    A large amount of the stereological error associated with liberation studies can he eliminated by assessing areas instead of linear intercepts. The presentation of a simple geometrical model as a ster

    Jan 11, 2011

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • ABM
    Data Driven Lean Mining Using Short Interval Control

    By Aaron Samuel Young, Hiago Antunes Amador de Oliveira, William Pratt Rogers

    Low commodity prices and lack of new high-grade deposits are pushing the mining industry for innovation. Lean mining has been vastly discussed in the past decades as a way to continuously improve mini

    Oct 3, 2019

  • AUSIMM
    Data Driven Resource Discovery Using Self-Organising Maps - An Introduction

    By B L. Dickson, J H. Hodgkinson

    The self-organising map (SOM) is an exploratory data mining technique that is both non-traditional and underutilised. Methodologies based on SOM tend to be data-driven and unsupervised, which makes th

    Jan 1, 2008

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • SME
    Data Evaluation for Sustainable Development Indicators

    By S. Möllerherm

    "The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A

    Jan 1, 2005