Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quality Management System on Sound Transit Underground Construction Projects
By Jim Salley, Mohammad Saleem, Indra Banerjee, Kevin Sapp
"On underground construction projects, effective Quality Management is essential for ensuring facility durability, life cycle performance and low maintainability. Furthermore, follow on contracts also
Jan 1, 2016
-
The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction Phase
By John Greenhalgh, Benoit De Rivaz
"1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro
Jan 1, 2016
-
Development and Testing of an Advanced Cryogenic Breathing Apparatus for Mine Escape
By D. F. Doerr, E. Blalock, D. R. Bush, K. D. Cohen
"INTRODUCTION The design, development, fabrication, and test of cryogenic breathing apparatus is part of a much larger effort funded by the National Institute for Occupational Safety and Health (NIOSH
Jan 1, 2016
-
The “Big Picture” Approach to Surface Mining
By L. Widdifield, R. Riggle
"In today’s challenging mining environment the “Big Picture” (Caterpillar, 2013) approach to mining is often neglected. With haulage costs approaching up to 45 % of the overall mining costs, all too o
Jan 1, 2016
-
CFD Modeling of a Novel Wet Scrubber for Capture of Respirable Dust in an Underground Coal Mine
"Controlling dust generation and keeping it below permissible limits at the working face of a room and pillar mine is a challenge for mine operators. With the recent changes in the respirable-dust reg
Jan 1, 2016
-
Innovative Support of Cross-Passage Openings in Segmented Liner
By Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
Preparing the Next Generation of Operators for Advances in Leaching
By Z. Sample
"INTRODUCTION This past year commodity prices continued their dip with increased volatility causing market values to slide another 16% putting increased pressure on even the largest companies to impro
Jan 1, 2016
-
Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFD
By A. Jolly, A. R. Kumar, T. Novak
"Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und
Jan 1, 2016
-
Examination of Copper Electrowinning Smoothing Agents. Part IV: Nucleation and Growth of Copper on Stainless Steel
By C. Heckman, M. S. Moats, A. Luyima, W. Cui
"Nucleation and growth of copper on 316L stainless steel from synthetic acidified copper sulfate was studied in the absence and presence of chloride ions and/or organic additives – HydroStar® 4208, DX
Jan 1, 2016
-
Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel
"The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an
Jan 1, 2016
-
Adaption of Protective Linings for Sewer Tunnels to Project Needs
By Gilles Recher, Jörg Riechers, Albert Lueghamer
"INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c
Jan 1, 2016
-
Analysis of Heat Loss Mechanisms for Mobile Tent-Type Refuge Alternatives
By P. T. Bissert, L. Yan, M. D. Klein
"Federal regulations require that refuge alternatives (RAs) are located within 305-m (1000-ft) of the working face and spaced at one-hour travel distances in the outby area in underground coal mines i
Jan 1, 2016
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions
By Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016
-
Time-Dependent Deformations of Excavations and Tunnels in the Greater Toronto Area
By Andrew Cushing, Joe Carvalho, Jon Hurt
"INTRODUCTIONThe shales of the Greater Toronto Area (GTA) have been known to experience time-dependent deformations (TDD); those initiated by excavation-induced stress relief which progress with time
Jan 1, 2016
-
Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground
By R. Schuerch, G. Anagnostou, R. Poggiati
"The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters
Jan 1, 2016
-
Computational Fluid Dynamics Modeling of a Medium-Sized Surface Mine Blasthole Drill Shroud
By W. R. Reed, J. P. Rider
"The National Institute for Occupational Safety and Health (NIOSH) Office of Mine Safety and Health Research (OMSHR) has recently developed a series of models utilizing computational fluid dynamics (C
Jan 1, 2016
-
Tunnel Lining for Drill and Blast Tunnels
By Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016
-
Rare Earth Element Concentrations in Product Streams of Coal Preparation Plants in the Eastern United States
By A. Bhagavatula, M. Rezaee, M. J. Kiser, R. Q. Honaker
"A field study of the coal preparation plant fleet in the eastern United States was undertaken to determine if quantify of rare earth elements (REEs) present in the product streams are large enough to
Jan 1, 2016
-
Hydraulic Assessment and Rehabilitation of a Deep Stormwater Tunnel
By Brandon Barnes, Michael Haggerty
"Around Minneapolis and Saint Paul, Minnesota, the local geology includes the St. Peter Sandstone, which is easily minable and has facilitated construction of interceptor tunnels for storm water and s
Jan 1, 2016
-
Risk Management – Correlation and Dependencies for Planning, Design, and Construction
By A. Moergeli, Philip Sander, John Reilly
"SUMMARY While the basic elements of risk management, including probability, consequences, risk registers, mitigation measures, etc., are now well understood, the process to include correlation, depen
Jan 1, 2016