Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Overcoming Massive Squeezing Ground Utilizing Curved Tunnel Face and Full-Face Excavation with Early Ring ClosureBy Hiroyuki Tamaru, Futoshi Kusumoto, Kosuke Tanimura, Atsuyuki Kimura
"SUMMARY The Hachinoshiri tunnel is a 2,469 m long two-lane road tunnel on the Chubu-Odan Expressway. Since more than 70% of the total tunnel length consists of low strength rock masses the competence
Jan 1, 2016
-
Recent Swedish Studies on the Extent of Blast Damage After ExcavationBy Rolf Christiansson, Daniel Johansson, Urban Åkeson, Henrik Ittner, Mats Olsson
"This paper presents two recent studies on the extent of blast damage after excavation in crystalline rock. The Swedish Transport Administration and the Swedish Nuclear Fuel and Waste Management Compa
Jan 1, 2016
-
Decision Analysis of Alternative Contracting Strategies for Tunnel Projects - Contracting Strategy Can Make or Break a Project Where the Success Is Measured With Key Performance IndicatorsBy Faruk Oksuz, Cary Hirner, Ray Brainard
"Key project participants, including owners, engineers, and contractors continually seek for sound and structured decision analysis on how to select the best contracting method for successful project
Jan 1, 2016
-
Effects of Major Ions in Recycled Water on Sulfide Minerals FlotationBy G. Bulut, Ü. Yenial
"The use of recycled water in flotation has significant effects on flotation and selectivity because the recycled water contains many dissolved compounds and ions that alter the chemistry of the syste
Jan 1, 2016
-
Assessing the Feasibility of Automated Data Monitoring and Control Stratiges for Chemical Treatment of NPDES Outlets: Bench-Scale StudiesBy C. Vass, A. Noble
"The chemical treatment of mine-influenced waters is a longstanding environmental challenge for many coal operators, particularly in Central Appalachia. Mining conditions in this region present severa
Jan 1, 2016
-
Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low OverburdenBy Chris Ashton, Andreas Rädle, Taner Aydogmus
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich
Jan 1, 2016
-
Roof Control, Pillar Stability, and Ground Control Issues in Underground Stone MinesBy D. Newman
"The U.S. stone industry is in a transition from surface quarries to single and multiple level underground stone mines. The factors driving this transition include surface quarries; ? reaching their e
Jan 1, 2016
-
Percussion Drilling as Fast and Efficient Investigation in Construction Stage - A Case Study from Koralm Base Tunnel, AustriaBy Giorgio Höfer-Öllinger, Peter Pointner, Manfred Stadlober
"SUMMARY Investigations from tunnel face are part of risk mitigation measures during the excavation works. With the tunnel equipment, percussion drillings of up to 30-40m can be achieved. Core drillin
Jan 1, 2016
-
Study of TBM Performance Prediction Using Rock Mass ClassificationBy Jamal Rostami, Alireza Salimi, Christian Moormann
"Rock mass classification systems are often applied in many empirical design practices in rock engineering, some contrasting with the original intent and applications of these classification systems,
Jan 1, 2016
-
Effect of Controlled Recirculation on Buildup of Methane Concentration in a Sample Booster Fan NetworkBy M. Shriwas, F. Calizaya
"Controlled recirculation may be considered as a beneficial means in mines of cold climate, where heating of air is required, and in deep or extensive mines, where cooling of air is required. Controll
Jan 1, 2016
-
Ventilation and Safety of Long and Deep Tunnels—State of the Art and New PerspectivesBy Samuel Rigert, Marco Bettelini
"INTRODUCTION AND OBJECTIVES Long rail tunnels require in most cases powerful mechanical ventilations. Besides requirements related to normal operation and maintenance, operational safety always requi
Jan 1, 2016
-
Use of Subsidence to Estimate Secondary Extraction of TronaBy P. W. Conrad, C. Todd, N. West, R. Kramer
"Surface subsidence caused by both underground room-and-pillar mining operations and solution mining operations have each been studied separately, but never combined. In 2008, FMC Minerals began using
Jan 1, 2016
-
Proposal of the Tunnel Face Stability Index (TFI) Based on the Critical Shear Strain TheoryBy Shingo Morimoto, Toru Sasaki, Masato Shinji
"1. INTRODUCTIONTunnel face stability is one of the most important consideration in New Austrian Tunneling Method. In general, if all of the material properties of ground can be obtained through the f
Jan 1, 2016
-
Training and Insertion of Female Professionals in the Chilean Minerals Industry: Chile vs. USABy M. Poulton, J. A. Botín, C. Gatica
"The Chilean minerals industry faces a shortage of 27.000 new skilled professional by 2023. Enhancing the integration of women into the workforce is a possible solution. This study analyzes the state
Jan 1, 2016
-
Sound Transit East Link–Downtown Bellevue TunnelBy Joe Hachey, Jerry Dorn, Jeff Schutt, Derek Penrice
"Sound Transit’s East Link Project, a $3.7 billion (2015 $), 14-mile light rail extension, will connect downtown Seattle with the rapidly developing east side cities of Bellevue and Redmond. Among the
Jan 1, 2016
-
Estimating the Density of Molten CaF2-Al2O3-CaO Slags based on Optical BasicityBy B. Birol, M. N. Saridede
"Slag density is a significant factor in determining the process efficiency of the electroslag remelting (ESR) process, where calcium fluoride (CaF2)-based slag is formed synthetically to refine metal
Jan 1, 2016
-
Blending Consistent and Predictable Feed to Achieve Improved Operational Efficiency with the Use of Nuclear Elemental Analyzers in the Phosphate Production ProcessBy C. Pace, D. Darlington, A. Montera, C. Lingren
"A phosphate beneficiation plant in Utah is using isotope-based Prompt Gamma Neutron Activation Analysis (PGNAA) technology to analyze the entire slurry streams of the incoming feed and final product
Jan 1, 2016
-
Performance Optimization in Clogging Soils through Process ControllingBy Ulrich Maidl, Marc Comulada, Janosch Stascheit
"INTRODUCTION Cohesive soils are notorious for causing clogging of the cutter head and the excavation chamber of tunnel boring machines (TBMs). While clogging leads to a drastic reduction in excavatio
Jan 1, 2016
-
Primary-Secondary Lining Interactions for Composite Sprayed Concrete Lined Tunnels Using Sprayed Waterproofing MembraneBy Jiang Su, Michal Uhrin
"The use of composite linings, consisting of permanent sprayed primary and secondary linings with a sandwiched spray applied waterproofing membrane is expected to improve efficiency and reduce lining
Jan 1, 2016
-
Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support FluidBy Britta Schoesser, Zdenek Zizka, Markus Thewes
"The support pressure of a slurry shield corresponds to the in situ earth and groundwater pressure to ensure the stability of the tunnel face. The support fluid (bentonite suspension) penetrates from
Jan 1, 2016