Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Operational Tool To Adjust Ore Polygons For Blast Movement - SME Annual Meeting 2022
By R. Mattos, E. Calcina, G. Quispe, S. S. Kanchibotla
During blasting, rock breaks and moves but standard grade control practices do not adjust ore waste boundaries to cater for blast movement. Rock movement resulting from blasts can result in mischaract
Mar 2, 2022
-
A Method To Eliminate The Use Of Hydrocarbons In Artisanal Mining - SME Annual Meeting 2022
By O. J. R. Baena, I. C. Sánchez, J. L. G. Guzmán
Frontino, a municipality in western Antioquia, Colombia, has more than 200 years of mining tradition. Currently, mining activities are carried out for lode gold using subway tunnels, where the grindin
Mar 2, 2022
-
P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024
By Jerry Luttman, Mark Dubay, Anvesha Dogra, Elizabeth Dwyre, Wei Hu
The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes desi
Jun 23, 2024
-
LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024
By Alix Thierart, Yann Rouillard, Bernard Catalano
Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac
Jun 23, 2024
-
BIM for Conventional Tunneling: The Sotra Link Project in Norway - NAT2024
By Andrea Biagi, Elisa Comis, Gianluca Bella, Enrico De Panicis, Guido Barbieri, Matteo Giani
The Sotra Link Project is a major infrastructure project in Norway involving the design, construction, financing and maintenance of several underground and surface structures between Sotra island and
Jun 23, 2024
-
Slurry Shield Cutterhead Torque Characterization Using AI Machine Learning and Mechanics-Based Modeling - NAT2024
By Hongjie Yu, Rakshith Shetty, Claudio Cimiotti, Nick Karlin, Mike Mooney, Vitaly Proshchenko, Matt Kendall
This paper documents an effort to explain cutterhead torque behavior observed during slurry pressure balance TBM tunneling through soft ground on the Los Angeles Clearwater project. AI machine learnin
Jun 23, 2024
-
The Application of Load Combinations in Ground-Structure Interaction Software - NAT2024
By Dale Brunton, Robert Adams, Michael Dutton
Tunnels and other underground structures are typically designed using ground-structure interaction models instead of traditional structural analysis programs. This allows for the degree of load sharin
Jun 23, 2024
-
Reconnecting Urban Landscapes Through Highway Lidding and Tunneling: A Comprehensive Study on Methodologies, Benefits, and Safety Considerations - NAT2024
By Bernd Hagenah, Katie Theis, Cristina Lauzon, Petr Pospisil
Lidding over or tunneling existing transportation infrastructure is currently under review in several U.S. cities. The main reasons for this are the use of the created space for urban development, the
Jun 23, 2024
-
Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024
By Irwan Halim, Stephane Polycarpe, Brian Hann
The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi
Jun 23, 2024
-
Construction Phase Services for Australian and North American SEM Tunneling - NAT2024
By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim
Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s
Jun 23, 2024
-
JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024
By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch
The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion
Jun 23, 2024
-
Application of the Observational Method in the T-48 Tunnel Project in the Himalayas - NAT2024
By Anuradha Khetwal, Sandeep Khetwal, Andrea Panciera
The observation method is a design optimization approach for the drill and blast method in tunneling. This method includes first identifying the hazard scenarios through site investigation, formulatin
Jun 23, 2024
-
Historic Storm Drain Tunneling Revealed by Los Angeles Metro Subway Construction - NAT2024
By Christophe Bragard, Jason Choi, William H. Hansmire
This case history provides a physical benchmark of tunneling technology progress comparing an old hand-mined tunnel to a modern 20-ft-diameter EPB TBM that mined in the same ground. This rare opportun
Jun 23, 2024
-
Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024
By Christian Heinz, Doug Harding
TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa
Jun 23, 2024
-
Durability Design and Construction for Underground Facilities - NAT2024
By Wern-Ping Nick Chen
Durability risks for underground facilities can be underestimated during design phase as compared to well-known geological risks. However, unclear durability requirements can result in construction sc
Jun 23, 2024
-
Remediation of the Falls of Ground in a Water Conveyance Tunnel - NAT2024
By Amir Karami, Scott Munro
This paper focuses on remediation of a 3.6 km long water conveyance tunnel that suffered two large falls of ground (FoGs), one of which subsequently progressed to the ground surface, resulting in full
Jun 23, 2024
-
Tunnel Design for When H2O meets FeS2 Underground - NAT2024
By Jim Finley, Adam Bedell, Eric Schrader
The CSO 52 Storage Tunnel and Pump Station project consists of 4,700 ft of hard rock tunnel, 2 intakes, and a 4 MGD wet pit pump station. During the geotechnical investigation, it was determined that
Jun 23, 2024
-
Rehabilitation of the Rawah Ditch Tunnels - NAT2024
By Ryan Marsters, Adam Pring
The Rawah Ditch is a mountainous water supply diversion which supplies Larimer County, Colorado with water since 1903. The ditch includes two historic tunnels excavated by drill and blast through a gn
Jun 23, 2024
-
Overcoming Design Challenges on the Ohio River Tunnel to Improve Water Quality in Pittsburgh, PA - NAT2024
By Zhenqi Cai, Mike Lichte, Kimberly Kennedy
The Ohio River Tunnel is the first of three combined sewer overflow tunnels to be constructed under Allegheny County Sanitary Authority's Clean Water Plan. The project consists of a total of approxim
Jun 23, 2024
-
To Swell or Not to Swell—Design of Underground Structures in the Presence of Swelling Clays - NAT2024
By Daniel Maine
Swelling clay soils have been problematic to many types of infrastructure in the United States. However, their impact on underground construction is often misunderstood. The use of swell pressures in
Jun 23, 2024