Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Alternative Delivery and Trenchless Methods Used to Install 60,000 LF of Pipe on the Bay Park Force Main Project - NAT2024
By Jeff LeBlanc, George Gutierrez, Carl Pitzer
The Bay Park Conveyance Project was one of the largest microtunneling and rehab projects in the United States at the time of completion. The completed project conveys treated water from the South Shor
Jun 23, 2024
-
TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024
By Dan Swidrak, Bill Zietlow
Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB
Jun 23, 2024
-
Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024
By Jeremy Cawley, Horry Parker Jr., Clint Wilson
The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam
Jun 23, 2024
-
Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024
By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote
On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun
Jun 23, 2024
-
Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024
By Sergio Flores, Nate Long, William Hodder, Phil Rhodes, Tim McQueary
The Surface Water Supply Project Segment B3 is a 4 miles section of tunnel that will run East- West in Houston TX, from Hopper St to I-45. The tunnel will be mined by using a 128" Dia refurbished 1987
Jun 23, 2024
-
Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024
By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone
The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal
Jun 23, 2024
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024
By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024
By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik
SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.
Jun 23, 2024
-
Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024
By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield
The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the
Jun 23, 2024
-
Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024
By Daniel Willis, Ryan O’Connell
An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w
Jun 23, 2024
-
Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024
By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda
The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio
Jun 23, 2024
-
Chimney Hollow Reservoir Project Inlet/Outlet Tunnel Excavation and Valve Chamber Construction - NAT2024
By Kyle Kittle, Kyle Knaeble, Albert Ruiz, Gregory Raines, Ryan Gewargis
The Chimney Hollow Reservoir Project (CHRP) is located southwest of Loveland, Colorado. CHRP is a component of the Windy Gap Firming Project, operated by the Municipal Subdistrict of the Northern Colo
Jun 23, 2024
-
Tunnel Belt Applications for Long Distance Tunnels with Curvy Alignments - NAT2024
By Marco Sonnenschein
Belt conveyors for tunnelling are industry standard and key to high performance of TBM drives. Conveyors reduce traffic in the tunnel and increase safety in the tunnelling process. This paper will ill
Jun 23, 2024
-
Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024
By A. Bhargava, V. Nasri
Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane
Jun 23, 2024
-
Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024
By Joseph Sopko, Xavier Lacourse-Dontigny
For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th
Jun 23, 2024
-
Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024
By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft
Jun 23, 2024
-
Optimization of Fire Design for FRC Tunnel Segments - NAT2024
By Nader Shahcheraghi, Verya Nasri, Mehdi Bakhshi, Ali Haghighat
An accidental fire load is one of the major loads considered in design of segmental linings in transit tunnel. Typically, a two-dimensional coupled thermo-mechanical finite element analysis (FEA) is c
Jun 23, 2024
-
TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara
As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol
Jun 23, 2024
-
Parallel Thimble Shoal Tunnel: Challenging TBM Assembly and Launching in an Existing Island - NAT2024
By Ruben Piqueras, Juan Luis Magro, Jorge Vázquez, Santiago Martínez, Xavier Manjarín
The Parallel Thimble Shoal Tunnel project involves the construction of a bored tunnel under Thimble Shoal Channel in Chesapeake Bay (VA), between two artificial islands and parallel to the existing tu
Jun 23, 2024
-
Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024
By David Jurich, Ed Perko, Jacob Prezkuta
Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public
Jun 23, 2024