    Flow Control in Tunnels - NAT2022

    By Darold Woodward, Stefan Haydn, Petr Pospisil

    Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu

    Dec 1, 2022

  • SME
    Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021

    By Jamal Rostami, Wei Hu

    Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us

    Jun 13, 2021

  • SME
    A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021

    By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer

    Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast

    Jun 13, 2021

  • SME
    Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021

    By J. Rostami, P. P. Nelson, A. Khetwaln

    Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in

    Jun 13, 2021

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SME
    Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022

    By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley

    Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t

    Dec 1, 2022

  • SME
    Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021

    By Peter Chou, Pooyan Asadollahi, Danny Lin

    To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho

    Jun 13, 2021

  • SME
    Back on Track: The Downtown Rail Extension - RETC2021

    By Meghan M. Murphy, Derek Penrice

    The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil

    Jun 13, 2021

  • SME
    Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021

    By Arash Dahi Taleghani, Pooyan Asadollahi

    Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr

    Jun 13, 2021

  • SME
    E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022

    By Peter Schmäh, Tobias Engel

    The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p

    Dec 1, 2022

  • SME
    The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022

    By B. Catalano, D. Ifrim

    The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel

    Dec 1, 2022

  • SME
    Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021

    By Josh Willhite, Seth Pollak, Ben Seling

    The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o

    Jun 13, 2021

  • SME
    Advance Rates in Soft Ground Tunnelling - RETC2021

    By Dan Ifrim

    Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi

    Jun 13, 2021

  • SME
    Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021

    By Gino Vogt

    In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations

    Jun 13, 2021

  • SME
    Updating the GBR Gold Book - NAT2022

    By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex

    Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help

    Dec 1, 2022

  • SME
    San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022

    By Jeremy Stone, Yiming Sun, John Stolz

    The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc

    Dec 1, 2022

  • SME
    Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021

    By Matthew Burdick, Andrew Rule, Erica Bailey

    The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly

    Jun 13, 2021

  • SME
    Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad Corridor

    By Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau

    Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r

    Jun 13, 2021

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022

  • SME
    Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021

    By Herman Gill, Dani Delaloye, Madelyn Rubin

    The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horsesho