Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
DWS Design & Construction Monitoring of a Road Tunnel Under Very Low Cover in the SNCF South-East European Technicentre in Paris - NAT2024
By Yassine Lahmadi, Edoardo Trivellato, Christian Chereau, Bénédicte Robert
Within the framework of the adaptation of the South-East European Technicentre (Technicentre Sud-Est Européen TSEE), SNCF Voyageurs appointed Pini with the project management mission (MOE) for the des
Jun 23, 2024
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024
By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024
-
The Importance of Wastewater Treatment Plants for Tunneling Projects - NAT2024
By G. Vogt
Water is one of the most important ressources of our planet. Unlike many other natural resources, water cannot be substituted by anything and must therefore be handled with the utmost care. Depending
Jun 23, 2024
-
CFD Simulation of the Effect of Bifurcation on Fire Smoke Temperature and Toxic Gas Evolution in an Underground Mine Tunnel: A Case Study - NAT2024
By Oluwafemi Salami
Conducting full-scale fire experiments in underground mines is difficult and expensive. Sometimes, it is impossible to carry out fire tests in mines due to the danger they pose to mine workers and the
Jun 23, 2024
-
Grouting Aggressive Ground in Qatar - NAT2024
By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski
Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con
Jun 23, 2024
-
Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024
By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
-
Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024
By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux
How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.
Jun 23, 2024
-
Why an Industry Education City for the Tunnelling Sector - NAT2024
By Ross K. Digby
The Victorian Tunnelling Centre (VTC) has evolved its purpose from purely training workers, to a tunnelling industry education city. The VTC has now focused its activities on the areas of technology;
Jun 23, 2024
-
The Anacostia River Tunnel System in Washington DC: Construction and Performance of One the World’s Largest CSO Reduction Infrastructures - NAT2024
By Jeffrey Peterson, John Beesley, Martino Scialpi, John Cassidy
The DC Clean Rivers Project is DC Water's ongoing program to capture and treat combined sewer overflows (CSOs) during rainfall before they reach the District waterways. The Anacostia River system was
Jun 23, 2024
-
Alternative Delivery and Trenchless Methods Used to Install 60,000 LF of Pipe on the Bay Park Force Main Project - NAT2024
By Jeff LeBlanc, George Gutierrez, Carl Pitzer
The Bay Park Conveyance Project was one of the largest microtunneling and rehab projects in the United States at the time of completion. The completed project conveys treated water from the South Shor
Jun 23, 2024
-
TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024
By Dan Swidrak, Bill Zietlow
Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB
Jun 23, 2024
-
Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024
By Jeremy Cawley, Horry Parker Jr., Clint Wilson
The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam
Jun 23, 2024
-
Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024
By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote
On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun
Jun 23, 2024
-
Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024
By Sergio Flores, Nate Long, William Hodder, Phil Rhodes, Tim McQueary
The Surface Water Supply Project Segment B3 is a 4 miles section of tunnel that will run East- West in Houston TX, from Hopper St to I-45. The tunnel will be mined by using a 128" Dia refurbished 1987
Jun 23, 2024
-
Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024
By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone
The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal
Jun 23, 2024
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024
By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024
By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik
SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.
Jun 23, 2024
-
Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024
By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield
The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the
Jun 23, 2024
-
Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024
By Daniel Willis, Ryan O’Connell
An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w
Jun 23, 2024
-
Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024
By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda
The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio
Jun 23, 2024