Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of Explosion Resistant SealsBy C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Jan 1, 1997
-
Construction Of Explosion Resistant Seals – Preprint 97-83By C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Feb 24, 1997
-
Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft RockBy Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima
"In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an
Jan 1, 2016
-
Construction Of First 20-Foot Diameter Machine-Bored Raised ShaftsBy R. A. Pond
Two 6.17 m (20 ft 3 in.) diameter raises, concrete-lined to 5.49 m (18 ft) inside diameter, were completed in 1978 at the Monterey Coal Company Number One Mine near Carlinville, Illinois, by Frontier-
Jan 1, 1979
-
Construction Of Geological Controls For Three Dimensional Orebody ModelingBy F. Daviess
A requirement for geological controls during orebody modeling results from the recognition of heterogeneous geological characteristics and/or abrupt variations in orebody geometries. While purely stat
Jan 1, 1992
-
Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri LankaBy Jamal Rostami, Ataollah Rahbar
"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a
Jan 1, 2016
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Construction Of Large Diameter Shafts With Reinforced Concrete Ring BeansBy Daniel L. Hanson
This paper presents case histories of the construction of four large diameter circular shafts using reinforced concrete ring beams as the primary internal support system. The case histories pertain to
Jan 1, 1987
-
Construction of Leach Pads on Steeply Sloping GroundBy Nancy C. Shaver, Alan Tapp
Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large
Jan 1, 1987
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal AreaBy Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station ProjectBy S. Holtermann
Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction of Oroville Dam - A Material Handling ChallengeBy Robert Walker
The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o
Jan 1, 1970
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983By Earl M. Woodward
INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors
Jan 1, 1983
-
Construction Of Port Huron, Michigan Intake ShaftBy D. E. Piggott, B. E. Hartmann
The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise
Jan 1, 1974
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder ProjectBy Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DCBy Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, OhioBy Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989