Interaction Between The Block Cave And The Pit Slopes At Palabora MineBy Peter Townsend, Sergei Diachenko, Allan Moss
The Palabora Mining Company has successfully extended the life of its operation by developing a 30,000tpd block cave underground mine below the now closed open pit. The process of transitioning from
Jan 1, 2006
-
Utilisation Of Low Grade Iron Ore Resources To Produce New Products1 And The Development Of The Sishen Expansion Project (?Sep?)2, Sishen Iron Ore Mine, South AfricaBy J J. Pretorius, G M. Hoffmann
Utilisation of lower-grade (<60 per cent Fe) resources, not utilised in the current products, is crucial to ensure optimal resource utilisation and maintaining/improving future profit margins by recla
Jan 1, 2006
-
Guaigui Multipurpose Project Rock Slope StabilityBy Bjørn Nilsen, Werner Stefanussen
The construction of the Guaigui Multipurpose Project includes a 74 metre high concrete face rock fill dam, a 350 metre long diversion tunnel and a 350 metre long spillway tunnel. The topography in the
Jan 1, 2006
-
Strategic And Tactical Mine Planning ComponentsBy R. M. Kear
Strategic and tactical planning are both required in the mining industry but have completely different objectives and require different environments. If these are not fully understood, then the best v
Jan 1, 2006
-
Anglo Platinum: Taking Advantage Of The Current Metal Prices And Shortage Of PlatinumBy G. Chunnett
Platinum metal prices have risen significantly during the past 18 months, and have remained at elevated levels. Driving these bullish prices are sustained jewellery demand, mainly from the Far Easter
Jan 1, 2006
-
A Review On The Progress Towards PT-Base Superalloys For Ultra High Temperature ApplicationsBy S. Vorberg, J. Preussner, B. Fischer, U. Glatzel, R. Völkl, M. Wenderoth
Pt-Al-X alloys have shown good mechanical properties and adequate oxidation resistance. Starting from a promising Pt-Al-Cr alloy, the influence of Ni additions was investigated. After ageing finely di
Jan 1, 2006
-
Recent Improvements At The BCL SmelterBy A. C. Legg, M. T. Malema
Keywords: Pyrometallurgy, flash, smelting, furnace, nickel, copper, Botswana BCL Limited operates the only Flash Smelting Furnace on the African continent, at Selebi-Phikwe, situated in north-east
Jan 1, 2006
-
The Corrosion Behaviour Of A Low Carbon Steel In Natural And Synthetic SeawatersThe corrosion behaviour of a low carbon steel was investigated in natural seawater and various synthetic seawaters. It was found that the steel corroded nearly four times faster in a 3.5% NaCl solutio
Jan 1, 2006
-
Stability Problems And Rock Support At The Tellnes Open Pit Mine, NorwayBy Bjørn Nilsen, Brian J. Ballou
The Tellnes open pit mine in Southwestern Norway has been operating since 1960. The maximum height of pit walls is currently about 150 meters with the current mine plan extending this distance to 400
Jan 1, 2006
-
Metix - Company ProfileBy R. Meyjes, P. Davies
Keywords: Pyrometallurgy, furnace, smelter, engineering company Metix is a private smelter engineering company wholly owned by its management. Its main lines of business in the ferro-alloy industr
Jan 1, 2006
-
Independence Platinum Limited (IPt) - Formation And ObjectivesBy R. E. Phillips, L. A. Cramer, R. T. Jones
Atomaer (Pty) Ltd is a technology-driven company with interests in Western Australian nickel. Atomaer (RSA) Pty Ltd is a process technology company operating in Southern Africa. It is a subsidiary of
Jan 1, 2006
-
Analytical Hierarchy Process For Selection Of RoadheadersBy O. Acaroglu
Selection of the most suitable roadheaders (boom type tunnelling machines) for the galleries/tunnels to be excavated in certain rock and under known project conditions is important for avoiding proble
Jan 1, 2006
-
Upgrade Of Multi-Phase Separation Vessels Utilising Cold Weld Polymer TechnologyBy David J. Blackwell
The challenge; to design production facilities and in particular separation equipment which have the ability to deal effectively with the ever changing composition of well fluids, over the life time o
Jan 1, 2006
-
Sulphuric Acid Leaching Of Zinc And Copper From Nigerian Complex Sulphide Ore In The Presence Of Hydrogen PeroxideBy P. A. Olubambi
The leaching of zinc and copper from Nigerian bulk sulphide ore with sulphuric acid in the presence of hydrogen peroxide was studied. The aim of the study was to investigate the effectiveness of hydr
Jan 1, 2006
-
Critical Factors For Sustainable Social ProjectsBy C. S. Chenga
Sustainable development is currently an extremely relevant concept worldwide, especially in developing countries like South Africa. Mining and metals companies are also directly affected by the sustai
Jan 1, 2006
-
Geotechnical Design For Open Pits At Tanjianshan, ChinaBy Huang Zhiwei, Paul Skayman, Kevin Holley
In 1989 The First Brigade for Geology and Mineral Exploration of Qinghai Province discovered gold at Jinlonggou and Qinlongtan, Tanjianshan. Between 1992 and 2002 small scale mining was carried out a
Jan 1, 2006
-
Factors In The Design Of Open Pit Slopes ? A Reviewer?s PerspectiveBy Peter Stacey
This presentation provides comments on the increasing challenges associated with pit slope designs from the perspective of a design reviewer. Besides the technical issues related to the significant i
Jan 1, 2006
-
DMS Cyclone Size Vs. Cyclone Efficiency: The De Beers PerspectiveBy Kurt RP Petersen, Hendriena van der Walt
With the decline in fine diamond production from the Argyle mine in Australia, there is a greater emphasis on efficiently treating the finer size fractions through a DMS circuit. Although it is genera
Jan 1, 2006
-
Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa MineBy G. B. Dukes
Scaling of rockpasses was problematic at Tau Lekoa Mine prior to production commencing in 1991. High horizontal stress levels relative to the host rock mass strength have been instrumental in causing
Jan 1, 2006
-
Spinel Removal From PGM Smelting FurnacesBy A. R. Barnes, A. F. Newall
Keywords: Pyrometallurgy, furnace, smelting, spinel, PGM, phase diagrams As Merensky reef ores are replaced by UG2 ores, chromium levels in PGM smelting furnace feeds have steadily increased. Inc
Jan 1, 2006