Flotation Cell Technology And Circuit Design ? An Anglo Platinum Perspective
By Anthony K. Anyimadu, Chris M. Rule
Froth flotation is the primary mineral processing separation step employed in the beneficiation of PGM ore bodies. Anglo Platinum operates a significant portion of the total installed flotation capaci
Jan 1, 2007
-
The major role played by calcium in gold plant circuits - Synopsis
By R. J. Davidson
Arguments are presented in favour of a new interpretation of the chemistry pertaining to the dissolution of gold, when this takes place in typical gold plant leach circuits where calcium is present in
Jan 1, 2007
-
Furnace Dust From Exxaro Sands KZN
By D. Bessinger, N. Rughubir
Exxaro Sands KZN produces?among other heavy mineral products?high titania slag, which is used as feedstock to the pigment industry. The titania slag is produced from the smelting of ilmenite in two 36
Jan 1, 2007
-
Water Balances In Hydrometallurgical Refineries
By M. Kirsten, W. H. Botha, M. H. Fox, J. A. Moolman, A. J. Lathwood
Water is a valuable and in many areas a scarce resource. Governmental legislation regulates the environmental impact of water usage and wastewater disposal through the issue of licenses. These require
Jan 1, 2007
-
Performance Update Of Hot Dip Galvanizing In The Corrosive Environment Of South African Gold Mine
By R. E. Wilmot
This paper is based on the experiences, over many years, of numerous authors in the South African mining industry and of the hot dip galvanizing process and its application as a corrosion protection s
Jan 1, 2007
-
Tata Steel?s Titania Project - Challenges In Slimes Disposal
By R. Gurung, S. Asokan, Ch. V. G. K. Murty, R. Upadhyay
Tata Steel Limited which is Asia?s first and India?s largest integrated private sector steel company, as part of its vision to grow in related industries is also undertaking the Titania project. The p
Jan 1, 2007
-
Evaluating An Alternative To The Gravity Recoverable Gold (GRG) Test (5a908109-c146-452f-85bc-eccbfc6ed436)
Knelson concentrators are commonly used to recover fine liberated gold in gold processing plants. The decision to employ a gravity gold circuit consisting of centrifugal devices such as Knelsons is pr
Jan 1, 2007
-
An Integrated Mineral Processing Pilot Plant Practical Programme Designed For Heavy Mineral Sands Beneficiation
By E. L. Thyse, P. Bepswa
The Western Cape Mineral Processing Facility (WCMPF) is a collaborative educational initiative between the Department of Process Engineering at the University of Stellenbosch and the Chemical Engineer
Jan 1, 2007
-
Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces
By I. Mc Dougall
Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,
Jan 1, 2007
-
Remote Characterization Of The Rheological Properties Of Sludges And Slurries - Preliminary Investigations Into A Novel In Situ Sensor
By D. Harbottle, D. Rhodes, T. F. Jones, S. R. Biggs
Multiphase process design and optimization often depends upon the rheological properties of sludges and slurries. In practice the task of determining these important properties is usually carried out
Jan 1, 2007
-
Estimation of cave geometry using a constrained velocity model inversion with passive seismic data - Synopsis
Careful monitoring of the position of the cave front is essential for well-managed block cave mining. Seismic monitoring systems yield 3-D information about the location of fracturing ahead of the cav
Jan 1, 2007
-
Measurement Of Typical Joint Characteristics In South African Gold Mines And The Use Of These Characteristics In The Prediction Of Rock Falls
By H. Gumede
The occurrence of fracturing due to high stress levels is a major factor in hangingwall stability in deep level gold mine stopes. However, rock falls cannot be the result of these fractures alone. Roc
Jan 1, 2007
-
End-Of-Life Mode Of Failure Of A Zinc Sulphide Concentrate Fluidised Bed Roaster And Its Rebuilding
By N M. Vegter, C B. Kohler, E H. O Meyer
Zincor operates four Lurgi fluidised-bed roasters at its roast-leach-electrowin refinery in Springs, South Africa. In 2006, Zincor?s four roasters had reached ages ranging between 26 and 38 years, whi
Jan 1, 2007
-
Flotation Enters Its Second Centenary With Higher Intensity And Bigger Capacity
By Timo Niitti, Sami Grönstrand
n today's marketplace with high metals prices, many operations are faced with the challenge of improving recovery and at the same time maximizing availability. New operations under feasibility st
Jan 1, 2007
-
CFD Modelling Of The Steel Belt Sintering Process
By L. Hekkala, J. Ollila, J. Keihäs, P. Mäkelä
The Outokumpu Steel Belt Sintering (SBS) Technology is used for manufacturing chromite pellets that are charged into a smelting furnace for ferrochromium production. One of the main elements in succes
Jan 1, 2007
-
Project Valuation, Capital Investment And Strategic Alignment - Tools And Techniques At Anglo Platinum (defa1552-deac-43da-9958-aabe8c199db2)
By G. L. Smith
Central to the success of any mining company is the ability to manage capital investment effectively so as to ensure acceptable stakeholder returns within an overall strategic context. Critical to thi
Jan 1, 2007
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process
By J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Benefits Of Increased Flotation Cell Size - A Pyrite Flotation Plant Case Study - Synopsis
By C. Wade, A. Swart, M. Dworzanowski
AngloGold Ashanti operate a pyrite flotation plant at their East Gold Plant, Acid Plant and Flotation Plant (EGAF) metallurgical complex within their Vaal River operations in the North West province i
Jan 1, 2007
-
Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)
By C. Musingwini
An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope
Jan 1, 2007
-
Uranium extraction: the key process drivers ? Synopsis
By D. Lunt
This paper describes and sets in context the commercially proven uranium extraction processes. It also discusses some of the technologies that are currently being pursued with the aim of reducing cost
Jan 1, 2007