Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SAIMM
    Keynote Address: Newmont?s contribution to gold technology

    Newmont is one of the few remaining large mining companies that was established in the early nineteen hundreds. The company has a long, colourful and enviable history. This paper provides highlights o

    Jan 1, 2009

  • SAIMM
    Deportment of Gold and Silver in the Pinos Altos Composite and Leach Residues: Implications for Recovery Improvement

    A mineralogical study was conducted on the feed (3.51 g/t Au and ~90 g/t Ag) and four leach residue samples (assaying 0.09 to 0.19 g/t Au and 30.0 to 61.5 g/t Ag) from the Pinos Altos silver-gold depo

    Jan 1, 2009

  • SAIMM
    Potential in situ leach exploitation of back-filled Witwatersrand gold mines: parameters and flow-rate calculations from a Zambian Copperbelt analogue

    By N. Steven

    Published parameters from the Mufulira copper in situ leach (ISL) in Zambia are used for order-of-magnitude flow-rate calculations for an envisaged gold ISL in back-filled Witwatersrand stopes. A succ

    Jan 1, 2009

  • SAIMM
    Characterization and recovery of gold associated with fine, activated carbon

    By J. Rowe

    The attrition of activated carbon, and the loss of gold associated with it, is of significant economic importance to the operation of a CIP/CIL circuit The focus of this study was on activated carbon

    Jan 1, 2009

  • SAIMM
    In situ measurements of Merensky pillar behaviour at Impala Platinum - Synopsis

    By B. P. Watson

    The Bushveld platinum group metal deposits in South Africa are the largest in the world. These deposits occur as two distinct stratiform tabular ore bodies and strike for many hundreds of kilometres.

    Jan 1, 2009

  • SAIMM
    Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery

    By A. Tello

    Variography was introduced by Dr. Pierre Gy to monitor a process, in the sixties. Later on, Francis Pitard extended this concept, building a complete system of variographic controls for different appl

    Jan 1, 2009

  • SAIMM
  • SAIMM
    The processing of eWaste. Part 1: The preparation and characterization of a metallic alloy derived from the smelting of printed circuit boards - Synopsis

    A brief overview is given of the issues regarding the processing of waste electrical and electronic equipment (WEEE). The printed circuit board component of WEEE is an exceptionally complex feed to po

    Jan 1, 2009

  • SAIMM
    Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)

    By P. N. Lategan

    Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m

    Jan 1, 2009

  • SAIMM
    Mass measurement for metal accounting?principles, practice, and pitfalls

    By C. M. G. Wortley

    One of the major deliverables of the AMIRA P754 Project, which was sponsored by several major mining companies, was a code of practice and guidelines for metal accounting for the mining and metallurgi

    Jan 1, 2009

  • SAIMM
    Shaft Sinking Methods Based On The Townlands Ore Replacement Project ? Raiseboring. - 1. Synopsis (1a409def-2d2d-4370-aaf2-3d4061365083)

    By D. Visser

    This paper is based on the Townlands Ore Replacement Project whereby the concept of conventional sinking of one large diameter shaft was declined and replaced with three smaller raise bored shafts. A

    Jan 1, 2009

  • SAIMM
    J Acid Plant Capacity Increase - 1. Introduction

    By Siyabonga Malevu

    Chemical Initiatives? Umbogintwini plant is the production facility of Chemical Initiatives? business. Umbogintwini?s J Plant manufactures sulphuric acid. The plant was designed and built by Simon Car

    Jan 1, 2009

  • SAIMM
    Production of Al-Ti master alloys from TiO2 in a DC arc furnace - Synopsis

    By M. Abdellatif

    The production of a 40% Al-Ti alloy was successfully proven at the lab scale, using pure TiO2, aluminium, and lime. These tests were conducted in an induction furnace maintained at 1600?16250C. The in

    Jan 1, 2009

  • SAIMM
    Summary of results of ACARP project on cross-belt cutters

    A project was funded by the Australian coal industry to investigate the mechanisms that might lead to sample bias when using cross-belt cutters, in order to help coal industry personnel to make better

    Jan 1, 2009

  • SAIMM
    Recovery of base metals and PGMs in a DC alloy-smelting furnace - Synopsis

    By R. T. Jones

    Base metals and platinum group metals can be collected in metallic alloy form, via a wide variety of smelting processes. The recovery, or degree of collection, of the valuable metals is a function of

    Jan 1, 2009

  • SAIMM
    The quantification of cyanide and its reaction products during leaching and cyanide destruction processes

    One of the key issues facing gold producers is the management of cyanide and the implementation of the International Cyanide Management Code. Many operations now use cyanide destruction processes to e

    Jan 1, 2009

  • SAIMM
    Fishy samples: how big a sample to avoid the infamous ?Poisson effect??

    By D. Francois-Bongarcon

    The ?Poisson effect? is defined and characterized. It takes place even when the material to sample is not liberated. Gy, Pitard, Ingamells, and others, including the author, recommend that a minimum a

    Jan 1, 2009

  • SAIMM
    AziSA: improving mining decisions with real- time data ? Synopsis

    By D. Vogt

    South African underground hard rock mines are typically managed using measurements made daily, weekly or even monthly of key parameters such as face advance, readiness to blast, blast success, tempera

    Jan 1, 2009

  • SAIMM
    Shaft Sinking Scheduling/Planning - Introduction

    By P. N. Lategan

    Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m

    Jan 1, 2009

  • SAIMM
    The processing of eWaste. Part 2. The electrochemical leaching behaviour of a metallic alloy derived from waste printed circuit boards - Synopsis

    Scrap printed circuit boards were selectively smelted at 1 200°C to produce a metallic alloy having three phases. These phases were identified as a lead-rich phase, a low tin content alpha bronze phas

    Jan 1, 2009