Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary
By William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary
By Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
5 Pile Testing - Pile Testing
By George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction
By P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage
1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution
Jan 1, 1994
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction
By Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:
By A. L. Garassino
Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside
Jan 1, 1994
-
3 Recent Developments In Pile Design - Developments In Pile Design
By W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes
By Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Deep Foundations On Deer Island
By Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
List Of Exhibitors
A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.
Jan 1, 1994
-
Tied-Down Boat Section Construction
By Romano J. Micciche
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High
Jan 1, 1994
-
Specialized Slurry Wall Equipment - The Hydromill - Summary
By Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Errata (5268ac87-18a9-458e-b334-4f72060324e3)
Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'
Jan 1, 1994
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction
By Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers
By J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
-
-
Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction
By A. Paviani
The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions
Jan 1, 1994
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction
By B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994