    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • DFI
    5 Pile Testing - Pile Testing

    By George Goble

    I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is

    Jan 1, 1994

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994

  • DFI
    3 Recent Developments In Pile Design - Developments In Pile Design

    By W. F. Van Impe

    The design of piles and of pile groups has remarkably progressed over the past two decades. The in­creasing complexity of the building concept implements a more rational approach of the deep foundatio

    Jan 1, 1994

  • DFI
    Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes

    By Niels Krebs Ovesen

    Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer

    Jan 1, 1994

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • DFI
    Specialized Slurry Wall Equipment - The Hydromill - Summary

    By Mario Mauro

    The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l

    Jan 1, 1994

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • DFI
  • DFI
  • DFI
    Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction

    By A. Paviani

    The subject of this session is "Equipment Installa­tion, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions

    Jan 1, 1994

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994