Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • DFI
  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    The Effects Of System Components On The Deflection Of MSE Retaining Walls

    By Scott C. Vollmer

    This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str

    Jan 1, 2003

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Fundamental Issues Of Displacement Auger Piling: The European Perspective

    By Maurice Bottiau

    When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond

    Jan 1, 2003

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Earth Pressure Acting On Single Driven Piles In Sand

    By Adel Hanna

    Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin

    Jan 1, 2003

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    Deep Foundations In The Challenging Geology Of Central Florida

    By Gary Kuhns

    Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo

    Jan 1, 2003

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • DFI
    7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction

    By Aly M. Mohammad

    The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent

    Jan 1, 2003

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2003

  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003