Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000
By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Dynamic Load Testing Of Augered Cast-In-Place Piles
By Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
High Strain Testing Of Augered Cast Piles At Miami Fort Power Station
By C. Michael Morgano
Static tests are costly and time consuming, so they are not always the best answer [ ]
Jan 1, 2005
-
Performance Of Drilled Displacement Piles In The Midwestern United States
By W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation
By Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 Years
By Brian Wilson, Franz-Werner Gerressen
"Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch
Jan 1, 2015
-
Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC
By Anil Bhandari
Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq
Jan 1, 2011
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History
By Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
New Technologies For Quality Control Of Augered Cast-In-Place Piles
By Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction
By Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction
By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2013
-
Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against Liquefaction
By Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa
"Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me
Jan 1, 2014
-
Underpinning Of A 16th Century Cistercian Abbey Foundation
By Michel Bustamante
The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou
Jan 1, 2002
-
Deep Foundations: Study on Effect of Drilling Fluids on Concrete Integrity
By Alberto Carmona Rosell, Sri Ram Ramankutty
"The installation of Bored Piles and Diaphragm Wall under slurry using tremie raises quality concerns on the integrity of concrete. It is vital to understand the effects on concrete integrity during c
Jan 1, 2015
-
Large Diameter Shafts - Youghiogheny Reservoir Bridge
By Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Design Strategy For Deep Slurry Stabilized Bored Piles In Compression
By Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002
-
Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional Installation
By Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru
"Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa
Jan 1, 2017
-
-
Presentation #4 - Reflections On Pile Integrity Testing
By Joram M. Amir
Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]
Jan 1, 2001