Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Jardim de Alah Station — Built in Olympic Time

    By Dario Libano, Luis Carlos Tenuta, Juliano Penteado

    "Subway Line Number 4 is one of the newest additions to the Rio de Janeiro subway network. Built for the 2016 Olympic Games, the 16 km (10 mi) subway line connects the south of the city, with the famo

    Jan 1, 2016

  • DFI
    Multiple Foundation Types For Bridges Over The Same Coal Mine

    By Kenneth M. Berrry

    A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b

    Jan 1, 2001

  • DFI
    BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODS

    By Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers

    Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali

  • DFI
    Bore Pile Stabilization Issues in Offshore Marine Works

    By Nuno Cruz, Saúl Rodríguez

    "When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work

    Jan 1, 2017

  • DFI
    What Causes Piles To Penetrate - Introduction

    By George G. Goble

    In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en

    Jan 1, 1995

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • DFI
    Difficulties In Caisson Construction

    By Ronnie W. Sisk

    1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum

    Jan 1, 1988

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    The Analysis Of Results From Routine Pile Load Tests

    By Bengt H. Fellenius

    THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma

    Jan 1, 1988

  • DFI
    Confirmation Of Composite Ground Design Using Field Plate Tests

    By Timothy C. Siegel

    In response to a solicitation for ground improvement for the construction of a new hospital in Owensboro, Kentucky, the team of Berkel & Company Contractors and Dan Brown and Associates PC designed an

    Jan 1, 2011

  • DFI
    Environmental Impact Management Through Foundation System - Synopsis

    By Deshmukh A. M.

    Existence of human beings and their relationship with the nature is symbiotic. The lack of perspective and negligence of nature disturbs the equilibrium of environment and causes unprecedented disaste

    Jan 1, 1996

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany

    By Schmitz Stefan, Stephan Jee-Sun

    "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy

    Jan 1, 2015

  • DFI
    Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington

    By David G. Winter

    The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t

    Jan 1, 1990

  • DFI
    Experimental Evidences From A Pile Load Test On A Driven Composite Pile

    By A. Garassino

    A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe

    Jan 1, 1991

  • DFI
    Engineering Sustainability

    "What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som

    Jan 1, 2009