Buckling Resistance of Steel Micropiles with Mechanical Splices
By Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala
"Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete
Jan 1, 2014
-
Building A High-Rise Adjacent To Transit Tunnels In San Francisco
By Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Building Drilled Shafts to Bridge the Mississippi
By Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile Foundations
By Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches
By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
Cannonsville Dam Emergency Borehole Response
By John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Capacity of Hydraulically Jacked Piles
By Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Case Histories of Circular Secant Pile Access Shafts for Tunnels
By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure
Jan 1, 2015
-
Case History: Comparison of CSL Results to Physical Observations
By David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Case History: Large Diameter Micropiles for the Highway 53 Relocation Project
By Nathan W. Iverson, David S. Graham, Paul J. Axtell
"The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a
Jan 1, 2017
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC
By Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Case Study: Natomas Levee Improvement Program Cutoff Walls
By Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Case Study: Feather River West Levee Program Cutoff Walls
By Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits
By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters
By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula
"This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat
Jan 1, 1900
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion
By Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
Cased Auger Piles (CAP): An Effective Piling Solution
By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions
By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Centrifuge Modelling Of Displacement Piles and Installation Effects
By J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900