Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    From ore to ferroalloy at Niobec Mine: The role of the geologist in ISO 9002 implementation

    By Eddy Dénommé, Deni Villeneuve

    "Niobec mine, a producer of pyrochlore concentrates since 1976, became a producer of ferroniobium in 1994 and achieved accreditation to the ISO 9002 standard in 1995. The goal of ISO 9002 is to ensure

    Jan 1, 1997

  • CIM
    Development of the Genesee power project

    By David C. Mulder

    As a result of the dramatic growth of Edmonton, Alberta during the past decade and the rapidly increasing price of natural gas, Edmonton Power has received provincial government approval to construct

    Jan 1, 1981

  • CIM
    The geology of the McClean uranium deposits, northern Saskatchewan

    By N. Saracoglu, J. P. Golightly, R. H. Wallis, J. J. Brummer

    "The McClean uranium deposits are in northern Saskatchewan, 11 km west-northwest of the Rabbit Lake mine. Their average grade is 1.8% UJ0 8 and they contain 6,350 tonnes of uranium oxide in seven pods

    Jan 1, 1984

  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    A Short History of Mineral Processing

    By Fathi Habashi

    "Crushing and grinding of ores and their beneficiation by washing away gangue minerals has been practiced since ancient times. Primitive crushing was done by hand pounding the ore with a hard stone th

    Jan 1, 2009

  • CIM
    Evaluation of Belt Conveyor and Truck Haulage Systems in an Open Pit Mine Using Life Cycle Assessment

    By Askari-Nasab, D. Checkel, K. Awuah-Offei

    Life Cycle Assessment (LCA) is an emerging environmental management tool for examining environmental impacts from cradle to grave. In this paper, LCA is used to evaluate the acidification potential (A

    Jan 1, 2009

  • CIM
    Mining Coal Under the Sea in Nova Scotia with Notes on Comparable Undersea Coal-Mining Operations Elsewhere

    By Francis W. Gray

    Introduction Extensive undersea coal-mining has developed on both the east and west coasts of Canada, and at this time some four million tons, or 25 per cent of the total output of Canadian coal, r

    Jan 1, 1927

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • CIM
    Milling Investigations into the Ore as Occurring at the Lake Shore Mine

    By The Staff

    FOR forty years cyanide men have been intensively engaged on the treatment of sulpho-telluride ores. So far as we know, the processes used today were-with the important exception of the concentration

    Jan 1, 1936

  • CIM
    Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba

    By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans

    Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi

    Jan 1, 1997

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    The Development of Gold Mining in Canada

    By G. E. Cole

    "Amongst the mineral products of Canada gold holds the second place in value of yearly output. . . . . .The production of gold has increased steadily during the past six years and has somewhat more th

    Jan 1, 1927

  • CIM
    "Blue Mining" The Future of Mining Initial Considerations for Underground Pumped Storage Plants

    By M. Kellner

    Due to continuously growing resource demands and increasing requirements for sustainability, safety and environmental protection on the other hand, the mining industry is being subjected to these addi

    Aug 1, 2013

  • CIM
    Classification of ore reserves based on geostatistical and economic parameters

    By F. W. Wellmer

    "I would like to comment on the classification scheme of ore reserves based on geestatistical and economic parameters as proposed by Wober and Morgan in the CIM Bulletin, January 1993.In principle, a

    Jan 1, 1993

  • CIM
    Cerro Verde Concentrator – Four Years Operating HPGRs

    By S. Koski, J. Vanderbeek, J. Enriquez

    "The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a

    Jan 1, 2012

  • CIM
    First Encounters between Communities and Mining

    By Alfredo Bambaren

    First Encounters between Communities and Mining 1. Importance, meaning and process 2. Antamina?s study case 3. ?Self-organization? theory (NLP) 4. The story we tell, the values we live 1. Impo

    May 1, 2010

  • CIM
    Effects of the Rolls’ Speed and Pressure on the HPGR Performance during Gold Ore Grinding

    By H. Dundar, C. Dzomeku

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    A Model for PGE Enrichment Due to the Splitting of Freezing Magma Chambers by Suspended Crystal Loads

    By Alan Rice

    The mechanism by which stratiform ore deposits of PGE (platinum-group elements) are laid down in ultrama?c igneous complexes is not completely clear. Early studies by the author and coworkers on numer

    Jan 1, 1997

  • CIM
    BIM for Facility Management: Design for Maintainability with BIM Tools (Construction Science and Management Program)

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    An Update of the SAG Milling Operation at the Peñasquito Mine Located in the Zactecas State, Mexico

    By David Meadows, Elmer Palmer, Steve Dixon

    As part of the Goldcorp Inc growth plan Minera Peñasquito SA de CV has developed its polymetallic deposit with a large “state of the art” concentrator to process lead and zinc ores. The plant consists

    Jan 1, 2012