Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill MaterialsBy E. Fried Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa May 1, 2007 
- 
                     Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of GelfillBy C. Doucet Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties May 1, 2007 
- 
                     Mechanical Strength of Green Iron Ore Pellets ? A New Approach Mechanical Strength of Green Iron Ore Pellets ? A New ApproachBy Mathieu Dubé Good mechanical strength of green iron ore pellets is required to avoid breakage and excessive deformation during their handling and further processing. However, green balls with good resistance to ha May 1, 2007 
- 
                     Design and Construction Evolution of the Kemess Mine Tailings Dam Design and Construction Evolution of the Kemess Mine Tailings DamBy Georgia J. Lysay The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat May 1, 2007 
- 
                     Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing PlantBy Jason J. Ballentine This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia May 1, 2007 
- 
                     Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh MineThe uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio May 1, 2007 
- 
                     Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54) Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil May 1, 2007 
- 
                     Éléonore Project Update Éléonore Project UpdateÉléonore Project Highlights Éléonoreis a multi-million ounce, high grade gold discovery in Québec Currently at the advanced exploration and engineering studies stage Excellent potential for expans May 1, 2007 
- 
                     Integrated Computer Aided Open Pit Design and Planning ?A Case Study? Integrated Computer Aided Open Pit Design and Planning ?A Case Study?By Oyku Selimoglu The key to successful mine production plan and subsequent operation is efficient mine layout design and optimization. Pit layout design and optimization allow the delineation and extraction of mineab May 1, 2007 
- 
                     Technologie de Forage et Consommation Énergétique : Étude Comparative Technologie de Forage et Consommation Énergétique : Étude ComparativeBy Roger Lacroix L?arrivée de nouvelles technologies sur le marché des foreuses portables combinée au besoin des mines à mieux consommer l?énergie électrique ont permis d?identifier le potentiel de deux nouveaux type May 1, 2007 
- 
                     Improvement in Performance of Main Ventilation Fan for Mines Improvement in Performance of Main Ventilation Fan for MinesBy Sib N. Mukherjee Main ventilation fans are used in all the mines and they run continuously 24 hours a day and 365 days in a year. Any improvement in their performance can lead to considerable power saving. The basic p May 1, 2007 
- 
                     Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USABy D. R. Tesarik Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near May 1, 2007 
- 
                     Mine Site Hydrogen Storage and Delivery Model Mine Site Hydrogen Storage and Delivery ModelBy M. C. Bétournay Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A May 1, 2007 
- 
                     Mine Planning for Ore Dilution Mine Planning for Ore DilutionBy John G. Henning Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a May 1, 2007 
- 
                     Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore Fines Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore FinesBy Stephen B. Hearn The SLon Vertical Ring and Pulsating High Gradient Magnetic Separator was developed to overcome multiple disadvantages associated with traditional horizontal type Wet High Intensity Magnetic Separator May 1, 2007 
- 
                     Harnessing a Global Workforce - Best Practice from the Oil and Gas Sector Capability Development and Competence Assurance (CDCA) Harnessing a Global Workforce - Best Practice from the Oil and Gas Sector Capability Development and Competence Assurance (CDCA)By Alyson Morley The mining sector in Canada is facing significant challenges to develop a competent workforce, including increased technical and logistical operational demands, and the imperative to promote local con May 1, 2007 
- 
                     A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand SilosA key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings May 1, 2007 
- 
                     Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine CavingBy C. O?Connor With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e May 1, 2007 
- 
                     Mine Planning Efficiency: A Quest for Improvement Mine Planning Efficiency: A Quest for ImprovementBy Alan D. Curtis A standard planning block model for Phelps Dodge North America Operations has been developed to improve mine planning efficiency and performance in a skill starved environment. The model saves time on May 1, 2007 
- 
                     Fuel Cell Aspects and Future Developments Needed for Mining Fuel Cell Aspects and Future Developments Needed for MiningBy Marc Bétournay This article examines how fuel cell technology and related power distribution system fits within mine operating requirements. Considerations for improvement of power plant architecture and functions t May 1, 2007 
