Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Benefits of Autogenous Grinding Milling When Processing the Fort A La Corne Kimberlites
By J. E. Danoczi
Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne area kimberlite field in central Saskatchewan. The
Nov 1, 2011
-
Open Pit Mining of Golden Band Resources? EP Gold Deposit - Open Pit Mining of Golden Band Resources? EP Deposit Waddy Lake Saskatchewan Open Lake Saskatchewan
By Charlie Harper
Open Pit Mining of Golden Band Resources? EP Gold Deposit Golden Band Resources Inc. (GBN:TSX-V) is Saskatchewan's newest Gold Producer. Located in the La Ronge Gold Belt of northern Saskatch
Nov 1, 2011
-
The Development of WFC/ROMS Ground Support Strategy at Cigar Lake Mine
By Cale J. Dubois
At Cameco Corporations' Cigar Lake Project, large excavations are developed on the 480 Level and 500 Level must remain stable for at least 15 years to host underground processing infrastructure.
Nov 1, 2011
-
New Locked Charge Protection System Prevents Damage To 14mw Geared Mill
By H De Beer
The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres
Nov 1, 2011
-
The Economics of Individually Motorized Rail Cars in Block Caving Operations
By Scott A. Stebbins
Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera
Nov 1, 2011
-
Water Recycling Methods Implemented at the Roy Lloyd Gold Mine Experience Gained and Future Plans
By R. C. Snider
The Roy Lloyd Mine in northern Saskatchewan is a high-grade underground gold mine which is currently supplying ore to Golden Band Resources Inc. (Golden Band)?s Jolu mill. Prior to the operation of th
Nov 1, 2011
-
Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)
By T. G. Joseph
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
Nov 1, 2011
-
An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba
By Matthew Violot
Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened
Nov 1, 2011
-
Applied Geo-Metallurgical Characterisation For Life Of Mine Throughput Prediction At Batu Hijau
Accurately modeling and predicting long term mill throughput is one of the challenges facing metallurgists, geologists and mine engineers in their quest to consistently deliver accurate life of mine b
Nov 1, 2011
-
Development of an Air Permeability Test Method and Application to Underground Mining
By S. Klemmer
Potential problems associated with groundwater inflows are a major concern to many Saskatchewan mining operations. Rock mass behaviour and stability have been linked to groundwater inflow potential. A
Nov 1, 2011
-
The Nine Keys to Maximizing Profits and Equipment Uptime through Inventory Management for Maintenance Parts
By Robert Lamarre
We will present the summary of a number of case studies whereby mining organizations have succeeded in maximizing equipment uptime by reducing the number of maintenance parts stock outs by more than 8
Nov 1, 2011
-
Cost-effective Air Separation Plants for the Mining and Mineral industry
By Goutam H. Shahani
Today, the mining and mineral sectors are being impacted by highly fluctuating supply ? demand, extreme price volatility and tremendous market uncertainty on a world-wide basis. This pattern is expect
Nov 1, 2011
-
Drill Maintenance Process Improvements: Brunswick Mine
By Steven Doyle
Presentation Outline ?Introduction to Brunswick Mine ?Mining Needs and Drilling Trends ?Maintenance Program ?Back to Basics ?Results ?Additional benefits Introduction Xstrata Zinc Brunswick
Nov 1, 2011
-
Selenium and Molybdenum Removal from Key Lake Mill Process Effluent
By Arthur Lieu
Outline Removal mechanisms of Se and Mo in the Key Lake Bulk Neutralization circuit Bulk circuit Detail process modification in the Key Lake BN circuit Process performance after commissioning Ob
Nov 1, 2011
-
Practical Belt Conveyor Design Decisions
By Jerry Z. Lu
Belt conveyor design involves the evaluation of belt tensions, drive selection, pulley configuration and other technical issues. The conveyor belt tensions vary with conveyor layout, drive pulley conf
Nov 1, 2011
-
Measuring, Predicting And Managing Grinding Media Wear
In 2009 Newmont Mining Corporation?s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t
Nov 1, 2011
-
A Work Area Monitor (WAM) to protect Production Crews from Rock Falls - Thiess ? Tarong Coal Project
By Nathan Ferdinands
Outline Overview of Site and Partners ?MeanduMine ?Thiess?GroundProbe Technology ?Work Area Monitor (WAM) ?Software control ?Alarms MeanduMine King2East pit failures ?Background, and Northern
Nov 1, 2011
-
Time-Between-Seismic Events to Enhance Seismic Source Interpretation
By D. Beneteau
Plotting sets of data collected over time using a frequency-magnitude distribution is common with both earthquake and mining seismology. A Time-Between-Events (TBE) analysis technique simply makes use
Nov 1, 2011
-
Company Liaison to Company Advocate
By Walter Smith
Environmental Quality Committee ?EQC was created in 1995 to facilitate dialogue between industry and northern communities and help build the understanding of the industry in those communities. ?EQ
Nov 1, 2011
-
Terraflow: A Cost-effective Alternative Binderin Backfill Application
By Ike Isagon
Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme
Nov 1, 2011