Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The Design Development, and Mining of the Southern 'B' Lode Orebody at NBHC

    The Southern 'B' lode orebody at the New Broken Hill Consolidated Limited (NBHC) mine, Broken Hill, is a continuation of the zinc-rich orebody that was first mined in NBHC in the 1940&apo

    Jan 1, 1977

  • AUSIMM
    The Design of a Roadway Support System for Dynamic Loads of tremors and Rockbursts

    By Maloszewski J, Kidybinski A, Sawka B

    A forecast of mining conditions in Upper Silesia collieries for the beginning of the 21st century has special focus on average depth of mining, energy of seismic tremors induced by mining and ener

    Jan 1, 1988

  • AUSIMM
    The Design Of A Sand Pump For Optimum Results

    The design of a sand pump is similar in principle to that of a water pump but differs in several areas. Results of experiments on sand pump performance have been summarized and values of design par

    Jan 1, 1973

  • AUSIMM
    The Design Of An Incremental Grinding Circuit Expansion At New Broken Hill Consolidated Limited

    By Chilman G. F, Lean P. J

    The New Broken Hill Oonsolidated LImited (NBHC) concentrator was commissioned in 1952 and underwent a number of expansions over the next 25 years. In 1978, the decision was taken to expand further

    Jan 1, 1983

  • AUSIMM
    The Design of Blends for the Production of Metallurgical Coke with Particular Reference to Long Term Aspects of Using New South Wales Coals

    Coking coals are very much in demand on a world wide basis, particularly the higher rank coking coals, which form an important part of many coking blends and which represent the smallest portion of th

    Jan 1, 1972

  • AUSIMM
    The Design of Carbon-in-Pulp Plants

    The efficient design of carbon-in-pulp (C.I.P.) plants involves the integration of both process engineering and design engineering.Many recently constructed plants have not recognised the above interr

    Jan 1, 1986

  • AUSIMM
    The Design of Coal Preparation Plants for Australian Coal

    By Pell D

    Mechanical cleaning of coal was porforined in a few small plants in New South Wales from 1577 brit the first large coal washeries were built by Broken Hill Wbprietary Company Limited and Australian

    Jan 1, 1969

  • AUSIMM
    The Design of Continuous Thickeners for Flocculated Materials

    By Goldney L. H

    The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment

    Jan 1, 1959

  • AUSIMM
    The Design of Draft Tube Circulators

    Draft tube circulators are now widely used instead of Pachucas for suspension of slurries in large tall tanks.Precipitators in the alumina industry are an example.Draft tube/tank diameter ratio is cri

    Jan 1, 1982

  • AUSIMM
    The Design of Multi-Seam Workings at Shallow Depth Under Tidal Waters

    By Anderson KG

    Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier

    Jan 1, 1986

  • AUSIMM
    The Design of Pre-split Blasts

    Effective pre-splitting is a key feature of wall control blasting. Most mining operations use historical designs or rules-of-thumb for designing pre-split blasts. If productivity and safety benefits

    Jan 1, 1995

  • AUSIMM
    The Design of the Rosebery (Tasmania) Concentration Mill - Factors Influencing Choice of Equipment

    BECAUSE of the attention given in recent years to the flotation process, there is an extensive range of equipment available to any staff detailed for: the design of a flotation mill. This statement ap

    Jan 1, 1929

  • AUSIMM
    The Design of Ventilation and Refrigeration Systems and Engineering Controls for the Enterprise Mine

    By R Brake

    The Enterprise Mine Project (EMP) is being developed by Mount IsaMines Limited as the future source of copper ore at the Mt Isa miningand processing complex. Environmental engineering is one of the ma

    Jan 1, 1998

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • AUSIMM
    The Design, Construction and Operation of a 500,00 Tonnes per Annum Carbon-in-Pulp Plant at Kambalda, Western Australia

    Economic conditions dictated the lead time from concept to commissioning of the Kambalda C.I.P. Plant. The high gold price prevailing at the time the Victory ore-body was discovered provided the imp

    Jan 1, 1982

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

    By S Miller, A Neale

    As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to furth

    Jan 1, 2003

  • AUSIMM
    The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western Australia

    By J deVries, A Broodryk, P Kyselica, K McLean

    Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc

    Aug 31, 2015

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    The Design, Installation, and Management of Computer-Based Process Control Systems in the Metalliferous Industries

    The sudden. explosion of relatively inexpensive digital process control computers has accelerated interest in the possibilities of economic savings by their use. In particular the metalliferous in

    Jan 1, 1977