Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Observations of Impacts to Pennsylvania's Interstate Highways by Longwall Mining

    By Anthony Iannacchionc, Jessica Benner, Harold Miller, Megan Witkowski

    "Longwall bituminous coal mining has been practiced in Pennsylvania since the 1970""s. Hundreds of longwall panels have been mined during the last 40 years but only 24 have actually undermined Pennsyl

    Jan 1, 2010

  • SME-ICGCM
    Cable Bolts - An Effective Primary Support System

    By Stephen C. Tadolini, John P. McDonnell

    "High-strength cable bolts have been used for ground support in underground coal mines for many years. Cable bolts are routinely used as secondary ground support in numerous longwall gateroad support

    Jan 1, 2010

  • SME-ICGCM
    Effects Of Mining On Underground Infrastructures In The German Hard Coal Sector

    By Anton Sroka

    The German hard coal production predominantly derives from underground multiseam mining activities. Beside common surface damages, ?inner mine damages? on underground infrastructures (i.e. main roads,

    Jan 1, 1999

  • SME-ICGCM
    Case Study Of Stability Investigations Related To Shallow Underground Mining Of Iron Ore In The United Kingdom

    By S. F. Smith

    Following a roof beam collapse on a major production district at the British Steel Corporation's Dragonby Iron Ore Mine, Scunthorpe, South Humberside, UK, rock mechanics investigations were under

    Jan 1, 1995

  • SME-ICGCM
    Full-Scale Performance Evaluation of Mobile Roof Supports

    By Thomas M. Barczak

    The performance characteristics of Mobile Roof Supports (MRS's) were evaluated through full-scale testing in the Strategic Structures Testing Laboratory at the National Institute for Occupationa

    Jan 1, 1997

  • SME-ICGCM
    Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads

    By Peng Cao, Jimin Su, Yang Li

    "Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai

    Jan 1, 2018

  • SME-ICGCM
    Three?Dimensional Ground Stability Study Around a Mine Tunnel in a Highly Discontinuous Rock Mass under Significant in Situ Stress

    By Pinnaduwa H. S. W. Kulatilake

    To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior of the rockmass surrounding the underground mine excavation. The aim of

    Jan 1, 2013

  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle Sandstone

    By Michael Murphy

    A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.

    Jan 1, 2014

  • SME-ICGCM
    Numerical Modeling Of Longwalls In Deep Coal Mines

    By Salah Badr

    Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar

    Jan 1, 2003

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Roof Movement and Loading for Top-Coal Caving Longwall Mining in Extremely Inclined Thick Coal

    By Shengliyang Yang, Jinghu Yang, Jiachen Wang, Xiaomeng Li

    "Safe and efficient mining of extremely inclined thick coal seams less than 20m thick is one of the new challenges in China coal industry. In recent years, the extremely inclined thick coal seams have

    Jan 1, 2016

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Establishment and Application of Deformation Monitoring System of Roadway Based on the Three?Dimensional Model Experiment

    By Yongping Wu

    Roadway deformation and stress migration occur with uncertainty and randomness because of geology, tunneling and mining influence. In order to study the surrounding rock deformation and failure mechan

    Jan 1, 2013

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Laboratory Investigation of Confinement-Dependent Mechanical Behavior of a Utah Coal

    By Bo-Hyun Kim, Steve Berry, Mark K. Larson

    "When coal pillar bursts occur, they involve the sudden expulsion of coal and rock into the mine opening. These events occur when relatively high stresses in a coal pillar, which serve as support in u

    Jan 1, 2018

  • SME-ICGCM
    Instrumentation of a Roof Bolter Machine for Void Detection and Rock Characterization

    By Soheil Bahrampour

    Void detection and identification of bed separation while drilling holes in rocks for roof bolting can be a great source of information for the evaluation of ground conditions and adjustment of ground

    Jan 1, 2013