Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Annual Review 2003 - Mining ReviewBy P. A. Plunkert, D. E. Morse, L. McCartan, S. F. Sibley
The average annual growth rate of real gross domes-tic product (GDP) from the third quarter of 2001through the second quarter of 2003 in the United States was about 2.6 percent. GDP growth rates in th
Jan 1, 2004
-
Geotechnical Considerations No. 7 Subway Line Extension Project in New York CityBy P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro
Jan 1, 2005
-
More Than 110,000 Attend ConExpo in Las VegasBy Steve Kral
More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We
Jan 1, 2002
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2By William H. Hansmire
The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during
-
The Economics of Mechanical Raise BoringBy James H. Dye, N. E. Norman
There will be about 300 raise boring machines used worldwide by late 1981, attesting to the acceptance of this drilling system by the mining and construction industries. Over the past few years, many
Jan 3, 1981
-
Coal-Based Energy Policy Needed for the 21st CenturyBy Maurice Deul
For the first half of the 21st century, the United States will rely on the same mix of fuels it has for the past 50 years. Petroleum for the United States will cost more and availability will decline
Jan 1, 2002
-
Case study ? ventilation planning for Bog Zone, Lisheen MineBy K. Hopperstead
Ventilation planning in trackless metal mining is often taken for granted. This paper highlights the trials of planning and executing the ventilation design for Bog Zone at the Lisheen Mine. Ventilati
Jan 1, 2009
-
Invensys’ User Conference Discusses Plant Automation and ControlBy Steve Kral
Invensys is a London-based supplier of automation and control systems to a variety of manufacturing and processing industries. Through its global subsidiaries, Invensys provides customized, advanced
Jan 1, 2002
-
Caterpillar With Tunnel Boom Boosts Productivity On Swiss ProjectA dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the
Jan 1, 2009
-
North American Tunneling 2010 Conference HighlightsEven though the economy of the United States remains in recession ? or not, depending on which economist you listen to ? muicipalities still need improved transportation, water and wastewater transit
Jan 1, 2010
-
Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation MethodA practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in TunnelingBy Remo Grandori
The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve
Jan 1, 2001
-
The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance TunnelBy Jamal Rostami, Ebrahim Farrokh
Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co
Jan 1, 2007
-
Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig
Jan 1, 2012
-
Measuring Carbon Emissions From Base Metal Mine SitesBy M. J. Farrell
The threat of global warming and its prominent position in public discussion and political debate requires all industry to take stock of its contribution to rising atmospheric concentration of greenho
Jan 1, 2009
-
Unitized, Portable Flotation-Leach Plants For Treating Partially Oxidized Gold And Silver OresBy Paul H. Johnson
Resource Engineering and Development, Inc. is desigining and building a portable 150 to 225 tpd, flotation-cyanide leach plant with unitized, skid-mounted components. This plant design, with its porta
Jan 1, 1981
-
Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam MiningIn order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars
Jul 28, 2020
-
Barrick Goldstrike Roaster Facility Dry Grinding And LeachingBy D. Denton, L. Buckingham
The dry grinding and leaching circuits of the Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of
Jan 1, 2001
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997