Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry WallsBy Charles M. Wilk, Lori Tiefenthaler
"Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is
Jan 1, 2017
-
New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure FoundationsBy Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer
Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct
Sep 8, 2021
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
Ethical and Risk Aspects of Deep Foundation SubcontractsBy Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Site Specific Study for Foundation Design of Iswar Gupta BridgeBy Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
Retaining Wall Installation Beneath An Existing StructureBy Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber OpticsBy Peter Faust, Peter Hubbard, Kenichi Soga
The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has
May 1, 2022
-
Stability Analysis Of Micro Pile Reinforced Idukki Soil SlopesBy Anjana C. P, K. Ranga Swamy
The hilly regions of Kerala are severely affected by excess rainfall, causing tremendous damage due to landslides and slope failures. It is necessary to strengthen the existing slope profiles to preve
Sep 1, 2022
-
Pressure-Grouting Improves Performance of Helical Piles: A Production Case History, Static Load Test Results, and Comparisons to Predicted Lateral Deflection and Axial ResistanceBy Karen J. Dawson, Francisco Johnson
"Pressure-grouted high strength helical displacement piles are a recently developed pile type that can be useful in conditions where noise or vibrations must be low or where access or clearance is lim
Jan 1, 2016
-
Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In PracticeBy Bartho J. Admiraal, Antoine Feddema
Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below
May 1, 2022
-
Analysis of Water Leakage in Downstream Dam Toe of Komani DamBy Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
120 Years of Caisson Foundations in ChicagoBy Robert E. Schock, Eric J. Risberg
"Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which
Jan 1, 2016
-
Practical Reuse of Foundations in High Rise ConstructionBy William H. Walton, Clyde N. Baker Jr., Darren S. Diehm
"A 51-story concrete core and steel frame commercial office tower was recently constructed on the site of the former US Gypsum building in downtown Chicago, Illinois, USA The structure foundation reus
Jan 1, 2005
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off WallBy Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney
"Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly
Jan 1, 2017
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet