Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft FoundationsBy Chunli Wei, Mark Jen, Xiaojun Wang
"After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i
Jan 1, 2016
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term ExposureBy D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult GeologyBy A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Screw and Straight Pile Behavior under Cyclic Compressive Loading in Dense SandBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano, Shinya Tachibana
"The helical piling system provides solution to many geotechnical related problems due to its quick installation, higher compressive and pullout resistance, no wastage of material, workable in limited
Jan 1, 2016
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Fundamentals FirstBy Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Dynamic Load Testing Of Non-Uniform PilesBy Thai Nguyen Ph. D
Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes
Oct 1, 2022
-
Numerical Modelling Of Nonlinear Piles ? SynopsisBy S. P. Lin
The numerical models of nonlinear piles for deep foundations are studied in this paper. The purpose of these is to clarify the mechanical behaviour of deep foundation nonlinear piles subjected to axia
Jan 1, 2010
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
Session 18 "Grouting for Micropiles & Anchors"By Jim Bruce
No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc
Feb 10, 2003
-
The Power of Committee Research: The DFI Rock Socket ProjectBy Anne Lemnitzer
Experimental data are the cornerstone of scientific research, providing empirical evidence to validate hypotheses, test theories, inform decision-making and help develop innovative design and analysis
Nov 1, 2023
-
A General Formula To Determine The Allowable Pile Bearing Capacity In Case Of Negative Skin Friction ? SummaryBy Cornelis Van Der Veen
Foundation piles, partly passing through unconsolidated compressible layers, suffer a downward drag that is called negative skin friction. The negative skin friction depends on the movement of the sur
Jan 1, 2010
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Geospatial Project Information Management System At Herbert Hoover DikeBy Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
Framework for Risk-Based Electric System Deep Foundation DesignBy Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017