Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia

    By Takashi Sasaoka

    The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th

    Jan 1, 2008

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    System behavior analysis of the ground movement around a longwall

    By Jian Wu

    In this paper, the surrounding rocks and the supports in a longwall are taken as an integral, i.e. a system. The structural characteristics and behavior of the system are discussed based on in-situ ob

    Jan 1, 1989

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Ultra-Thick High-Production And High-Efficiency Longwall Mining Technique With Retreat Mining Along The Seam Dip Direction And Under Complicated Geological Conditions (6f1eec60-4383-4b46-a3c6-b20670410c29)

    By Ke Yang

    In Chinese coal mines, extraction of deep, highly gassy soft coal seams sandwiched between soft floor and soft roof in complicated geology is commonly encountered. How to safely and efficiently excava

    Jan 1, 2009

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    Subsidence Prediction for Multiple Seam Extraction under Consideration of Time Effects by the use of Geomechanical Numerical Models

    By Jurgen te Kook

    State-of-the-art for subsidence calculation are stochastical models. Although these models were successfully used all over the world they have their limitations due to the fact that they are not based

    Jan 1, 2008

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • SME-ICGCM
    The Next Generation of Cable Bolts for Improved Ground Support

    By Stephen C. Tadolini

    PC-Strand tendons, commonly referred to as cable bolts, have become a major rock reinforcement device for underground mining and civil applications. The most common configuration is a 1+6 strand, whic

    Jan 1, 2012

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    The In-Situ Pillar Strength and Overburden Stability in U.S. Mines

    By Hamid Maleki

    Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall

    Jan 1, 2008

  • SME-ICGCM
    Knowledge Is Power: Introducing the Midas, a New Permissible Datalogging System for Use in Mines

    By Tristan H. Jones

    Beginning in 1987, miniature dataloggers approved by the Mine Safety and Health Administration (MSHA) were publicly available for sale. The principal among these was the model CR21XQM, manufactured by

    Jan 1, 2012

  • SME-ICGCM
    Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)

    By Andrzej Walentek

    This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac

    Jan 1, 2009

  • SME-ICGCM
    The Development and Application of Polyurethane Injectable Cable Bolts

    By Dakota D. Faulkner

    Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United

    Jan 1, 2012

  • SME-ICGCM
    Transitional Geology and Its Effects on Development and Longwall Mining in Pittsburgh Seam

    By Jun Lu, Mark Van Dyke, Daniel W. H. Su, Greg Hasenfus

    "This paper presents the geologic and ground control challenges that were encountered by CONSOL Energy’s mining operations in southwestern Pennsylvania. A sandstone-to-limestone geology transition was

    Jan 1, 2015