Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Six Pillars, Inventory Management & ATF Record-keeping
By Ron Ketterling
Donna Summer wrote and recorded a song in 1983 with Michael Omartian called, “She Works Hard for the Money.” The song was inspired by her encounter with an exhausted rest room attendant, Onetta Johnso
-
Continuing Improvements in Longhole Stoping at the Bulyanhulu Mine
By P. O'Connell, J. Lever, C. Clemence
The Bulyanhulu Mine, Tanzania is constantly trialing ideas for improvements in the drill and blast process. The project work has resulted in a large number of choices in explosive type and charging me
Jan 1, 2006
-
Correlation of Measurement-While-Drilling Parameters to Fragmentation
By Kain Petterson, P D. Katsabanis
Blast fragmentation, determined using image analysis was correlated to drill monitoring parameters in an open pit operation. Average fragment size and 80% passing size showed strong correlation with s
Jan 1, 2013
-
10th International Symposium on Rock Fragmentation by Blasting - Fragblast 10 (FB 10) 24-29 November 2012, New Delhi India
By Agne Rustan
The goal of this paper is to describe Fragblast 10 for those who did not have the opportunity to attend the Symposium and also give some examples of new research findings used in practise in some coun
Jan 1, 2013
-
Strain-Based Vibration Criteria for Blasting in New York City
By Catherine T. Aimone-Martin, Meyers Joseph A.
A new strain-based criteria is being adopted for rock blasting in New York City (NYC). This criteria is based on several years of research involving vibration measurements of tall structures during bl
Jan 1, 2019
-
Preventing the next Terrorist Attack is a Shared Responsibility
By Joseph Kennedy
How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly
Jan 1, 2010
-
Journal: 100 Years / US Department of Agriculture Farmers' Bulletin
By Harry Thompson
In using explosives to blast stumps from the ground in order to prepare it for farming, it is comparatively easy to place the charge under a stump having a semitaproot or a lateral system of rooting b
Jan 1, 2015
-
Evaluation of Drilling and Blasting Using Explosives Based on General Adherence of the Drilling and Rock Blasting Plan
By Jair Koppe
The unsatisfactory blasting effect is mainly related to the improper selection of design parameters of drilling and blasting scheme. In order to evaluate the rationality of drilling and blasting schem
Feb 6, 2023
-
Journal: 100 Years / SCIENTIFIC AMERICAN New York December 2, 1911 / Hudson Maxim
By Robert Hopler
HUDSON MAXIM A Noted Inventor of High Explosives ALTHOUGH the subject of the present sketch has been a tireless worker in many fields of activity, his name is best known in connection with his work in
Jan 1, 2012
-
Underground Blast Monitoring and Rock Mass Anisotropy
By Jody Todd, Ernesto Villaescusa, Ronald Lachenicht, Kelly Fleetwood
In the underground environment, characterisation of a rock mass during the mining cycle becomes increasingly difficult due to a lack of rock mass exposure for measurement or observation. In most cases
Jan 1, 2008
-
Blasting of the Twin Creek's Highwall Failure
By James A. Bachmann, Christopher J. Gray
On December 26, 1994, at 1:00 am, Santa Fe Pacific Gold's Twin Creeks Mine experienced a major highwall failure involving over 2.5 million tons. The resulting effects of this slide were thousands of o
Jan 1, 1996
-
Developments in Cast Blasting Using High Bulk Strength Explosives at Rietspruit Opencast
By Mike D. J Bonneau, Malcom Jr Ford
Rietspruit Opencast Services was one of the first opencast coal mines to successfully employ cast blasting to aid in the burden removal operation. Initial work on cast blasting began at the mine in 19
Jan 1, 1991
-
A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)
By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves
The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t
Jan 21, 2025
-
Underground Airblast Monitoring for Blast Performance Diagnosis and Detailed Attenuation Modelling
By Jon Hurt, Brent Meins, David Vardiman
"Two test blasts were conducted at the Sanford Underground Research Facility to establish optimum blast designs and to limit blast effects on existing research rooms and equipment in preparation for t
Jan 1, 2017
-
Preparing a Written Blast Plan
By David Ziegler
Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re
Jan 1, 2004
-
Journal: Evaluating and Managing Blasting Risk Part I
By Gordon Revey
Over ten million pounds of explosives are used daily to blast rock in mines, quarries and construction projects throughout the United States. Despite the immense volume of explosives used, serious inc
Jan 1, 2001
-
Journal: Summary Report of the Seismic Regulation Subcommittee
By Larry: McAnuff Schneider, Edward Walter, Gordon Shaw, Daniel Grieco, Dennis Clark
During the 1998 Annual Conference of the International Society of Explosives Engineers (ISEE), the Seismograph Section established a subcommittee for the purpose of compiling a list of all regulations
Jan 1, 2001
-
Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager
By Steve Dillingham
Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m
Jan 1, 2001
-
3D Computer Simulation of Bench Blasting With Precise Delay Timing
By Dale Preece, C. Mick Lownds
Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precisi
Jan 1, 2008
-
Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software
By Stephen Chung, Graham Mustoe, Joe Haid
In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th
Jan 1, 2006