Design And Construction Of A Cut-Off Wall In Warm Permafrost
By Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Video Inspection Of Rock Sockets For A Piling Project
By Ali Ameli
Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th
Jan 1, 2006
-
Downtown Seattle Transit Project - International District Station
By Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium
By Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History
By Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method
By Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse
By Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project
By Michael Lane
With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes
Jan 1, 2008
-
Geotechnical Exploration Phase Drilled Shaft Load Testing
By Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Marine Foundation Retrofit For The Richmond - San Rafael Bridge
By Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers
By J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
Jetting-Assisted Sheet Pile Driving
By Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
Innovative Use Of Micropile Load Test Data For 18th Street Expressway Bridge
By Lance A. Roberts
Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor
Jan 1, 2009
-
Frequency-Variable Vibrators And Their Application To Foundation Engineering - 1 Introduction
By K. Rainer Massarsch
In some parts of the world, vibrators are used extensively for different types of foundation engineering projects. If used correctly and in suitable soils then vibratory pile driving for example is ve
Jan 1, 1995
-
-
Impact And Ramifications Of Setup For Pile Foundations
By Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Experiences From The Italian High Speed Rail Network AV Construction
By Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Design And Construction Of The Sutong Bridge Foundations
By Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical Problems
By Maurizio Siepi
The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w
Jan 1, 2002
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile Groups
By Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018