Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism Performance
By Richard Peaker, Jens Lichter, Alexander V. Potapov
"The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a
Jan 1, 2007
-
The Development and Commissioning of Ontario’s First Diamond Mine: Victor Diamond Mine
By N. Morrison, I. Holl, R. Welyhorsky, A. Hempstock
ABSTRACT: The Victor diamond mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario. The process
Jan 1, 2011
-
Owl Creek Processing Summary
By O. Matwijenko
"1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with
Jan 1, 1988
-
Rabbit Lake project – environmental impact
By R. L. J. Phillips
"The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental
Jan 1, 1989
-
A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process
The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent
Jan 1, 1979
-
Shaft hoisting system for Olympic Dam
1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and
May 1, 2003
-
Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada
Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail
May 1, 2009
-
Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine
By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby
"Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe
Jan 1, 2017
-
Sub-aqueous Inpit Deposition of Uranium Tailings at Key Lake
By Trevor Hamm, Nick Holl
"Cameco Corporation is operator of the world's richest uranium project, the Key Lake mine/mill complex, located within the Athabasca region of Northern Saskatchewan. Mineable resources from the Key La
Jan 1, 1998
-
Belt conveyor booster drives
By J. A. Stewart
"A common problem in the mining industry involves the overloading of established conveyor systems. This overloading can have a number of causes, such as new production technology or a changing market
Jan 1, 1982
-
Groupe d'objects provenant des Forges du St-Maurice II considérations sur leursaffinités et leur mode d'élaboration
By T. Vovan, A. Galibois, M. Fiset
"In order to establish some links between the 22 specimens found on the site of Les Forges du St. Maurice, their slag inclusions have been analyzed by electron microprobe. Comparison between their con
Jan 1, 1984
-
Arctic Resource Development Challenges for Environmental Approvals
By Nick Poushinsky
OVERVIEW OF PRESENTATION ?Stantec?s Northern Presence ?Challenges for Northern Development ?Environmental Approval Challenges ?History/Expectations ?Baseline Data ?Consultation ?Regulatory Pr
May 1, 2009
-
Atlas Copco drill rigs for mine automation and communication—A totally new technology platform for advanced mining systems
By M. Ramström
"In 2002, Atlas Copco Rock Drills AB released the new rig control system (RCS) technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on mo
Jan 1, 2005
-
Doing More with What We Already Know – Improving the Efficiency of Minerals Processing
By Joe Pease
"The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin
Jan 1, 2015
-
Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario
By A. H. Mumin, A. K. Somarin, K. S. Oran
"Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake
Jan 1, 2007
-
Tribological factual data base for the mining industry
By J. Molgaard, J. Masounave, J. Prinsen, P. Beaulieu, G. Huard
"A study carried out on behalf of the National Research Council (NRC) indicates that economic losses due to wear in the Canadian mining industry are in excess of $700 million annually. Severe wear, ma
Jan 1, 1987
-
Simple Mechanisation of Narrow Vein Deposits in South Africa
By Julian Wills
The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of
Oct 1, 2001
-
Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba
By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans
Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi
Jan 1, 1997
-
Diamonds: A Canadian Perspective
By John Lindsay
"Although diamond mining is a relative newcomer to the Canadian mining industry, with the first diamond mine coming on stream in 1998, Canada is already a significant producer of high quality diamonds
Jan 1, 2003
-
An In-Plant Test of Sphalerite Flotation without Copper Activation
By Q. Zhang, J. A. Finch
"Sphalerite flotation in the absence of copper activation at moderately alkaline pH has been observed in laboratory studies. An in-plant test of this observation was conducted at Kidd Creek Mine LTD.
Jan 1, 1992