Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Dentonia Flotation Mill

    By W. Holdsworth

    The flotation mill of Dentonia Mines, Limited, at Greenwood, B.C., went into operation on April 20th, 1934, and by October 11th a total of 15,000 tons of ore had been treated. It is intended in this p

    Jan 1, 1935

  • CIM
    The Propsed Ore Control at the Coronation Mine, Saskatchewan

    By J A. Gilliand

    Mineralogical cross sections of orebodies on the 300-,600- and 900-foot levels of the Coronation mine have been interpreted in terms of centers of mineralization. The maximum concentration of chalcopy

    Jan 1, 1965

  • CIM
    The Spectrographic Laboratory of the Hudson Bay Mining & Smelting Co.

    By D. L. Griffith

    THE realization by metallurgists of the important effect that traces of impurity may have upon the properties of a metal, and their steady demand for purer and still purer metals, have made the specia

    Jan 1, 1940

  • CIM
    Research on Bionic Unit Diameter and Arrangement Affecting the Performance of Bionic Drill Bits

    By Chuan-liu Wang

    The bionic non-smooth surface has the characteristics of anti-wear, and reducing resistance. Based on bionic non-smooth surface?s characteristics, a bionic drill bit was developed. When the bionic dri

    Aug 1, 2013

  • CIM
    Physical Separation Process for Recovering Tantalum Capacitors from Electronic Devices Mounted on Printed Circuit Boards

    By Tatsuya Oki

    Tantalum capacitors can be found mounted on printed circuit boards of domestic appliances such as personal computers. These capacitors contain a considerable quantity of expensive metal tantalum and c

    Jan 1, 2011

  • CIM
    Processing of Copper Sulphide Ores and Concentrates Resulting in the Production of High-Grade Matte and Rejected Slag in one Unit - Two-Zone V Aniukov Furnace

    By V. F. Kozyrev, L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS has developed a new process and equipment for melting copper raw material in a two-zone Vaniukov furnace resulting in the production of white matte and low-grade slag in term

    Jan 1, 2007

  • CIM
    Shaft Sinking Through Heavy Overburden at Falconbridge

    By R. M. Oliver

    THE Falconbridge property is almost completely covered with over-burden to a depth varying from 60 to over 200 feet. This overburden consists of grave], sand, and boulder, with bands of very fine silt

    Jan 1, 1938

  • CIM
    Increase of efficiency and decrease of power consumption in SO3 recycling from the off-gas of pyrometallurgical processes

    By Y. G. Yaroshenko, V. Y. Baldin, Y. M. Gordon

    The manufacture of sulphuric acid from the off-gas of pyrometallurgical processes in the production of heavy metals is one of the common methods of effective recycling of sulfuric anhydrite. The new I

    Jan 1, 2004

  • CIM
    The Control of Iron and Arsenic in the Treatment of Gold Bearing Enargite Concentrates

    By C. G. Anderson

    As the global demand for copper and gold steadily increases and the need for environmentally sound processing also grows, successful hydrometallurgical treatment of enargite (Cu3AsS4) concentrates has

    Jan 1, 2006

  • CIM
    Surfactant Protected Gold Particles: New Challenge for Gold-On-Carbon Catalysts

    By Laura Prati

    Gold-on-carbon catalysts resulted very active and selective in liquid phase oxidation [1, 2, 3] and during past studies we established that activity is ruled by two factors: particle dimension and gol

    Oct 1, 2003

  • CIM
    Friction Stir Processing of Sand-Cast Aerospace Magnesium Alloy ZE41A-T5

    By X. Cao

    Friction stir processing (FSP) is used to produce wrought microstructures at the surface of sand-cast aerospace grade magnesium alloy ZE41A-T5. It is found that the microstructure is significantly ref

    Jan 1, 2007

  • CIM
    Control Blasting for Slope Stability at the Adams Mine

    By Barry J. Morash

    The over-all slope angle of between 55 and 60 degrees at the Adams Mine necessitates control blasting on the final pit walls. The control blasting techniques used are pre-shearing and buffer blasting.

    Jan 1, 1978

  • CIM
    The Extractive Metallurgy of Agromined Nickel

    By William Hawker, James Vaughan, Jeff Chen, Antony van der Ent

    "Nickel agromining utilizes hyperaccumulator plants (“metal crops”) to extract nickel from low-grade soils, a process that yields high-grade nickel bio-ore. This feedstock is further processed into a

    Jan 1, 2016

  • CIM
    Post-mineralization Breccia Dike from the Sar Cheshmeh Porphyry Copper Deposit, Kerman, Iran

    By J. Shahabpour

    "Abstract - Breccias with angular and rounded clasts of a late-mineralization, ""barren"" hornblende porphyry dike set within a comminuted matrix consisting of rock fragments and quartz, cemented by q

    Jan 1, 1994

  • CIM
    Inco's SO2 - Air Cyanide Removal Process

    By R. Vergunst, E. A. Devuyst, G. Robbins

    "INTRODUCTIONThe Inca process for continuous cyanide removal from industrial wastewaters was patented in 1984 by G.J. Borbely, et.al. (1). The process requires SO2, air, lime and a copper catalyst. Bo

    Jan 1, 1989

  • CIM
    The Red-Chris porphyry copper-gold deposit, northwestern British Columbia

    By J. M. Newell, G. R. Peatfield

    "The Red-Chris porphyry Cu-Au deposit is located between Ealue and Kluea lakes, southeast of the village of Iskut on the Stewart Cassiar highway in northwestern British Columbia. It was explored by Te

    Jan 1, 1995

  • CIM
    Improving the Energy Efficiency of Mine Fan Assemblages

    By E. De Souza

    Energy associated with ventilating an underground operation comprises a significant portion of a mine operation's base energy demand and is consequently responsible for a large percentage of the

    Aug 1, 2013

  • CIM
    Advances in Process Control of SAG Mills at Kennecott Utah Copper Copperton Concentrator

    By Mark Holdsworth

    In 2002, Kennecott Utah Copper Copperton Concentrator installed an Expert Control system for optimization of their SAG and Ball milling circuits. The advanced process control has been well received an

    Jan 1, 2012

  • CIM
    Precious Metals Leaching from Electronic Wastes

    By F. Rashchi, N. Naseri Joda

    Recycling of electronic wastes is an important subject both from an environmental point of view and also the recovery of valuable materials. In this research, PC board scraps were leached to recover C

    Jan 1, 2011

  • CIM
    Combining Sources of Rock Mass Characterization Data for Stope Design

    By Karina Forster

    Open stope design depends on the ore body geometry, loading conditions and rock mass properties to estimate stope dilution and ground support requirements. Rock mass conditions for design primarily re

    Jun 1, 2012