Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)
By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes
"The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat
Jan 1, 2017
-
Sill pillar recovery at the Louvicourt mine
By D. Fleury
"This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%
Jan 1, 2005
-
Variation of thermal conductivity of rocks with pressure
By A. Demirci, A. Keçeciler, Y. S. Durutürk
"This paper deals with the results of the variation of thermal conductivity of rocks with pressure on a laboratory scale. For this purpose, the authors have added a pressure-supplying unit to the appa
Jan 1, 2002
-
Research and Productivity
By John Convey
This short paper deals with the subject of research and its relation to productivity. All who have stopped to even think about industrial re-search and its impact on the nation-al economy take for gra
Jan 1, 1964
-
Hydrogeological Aspects of Three Open Pits within Noranda Operations
By L. C. St. Arnaud
"Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p
Jan 1, 1990
-
Extraction of No. 2 East Pillar at Waite-Amulet Mines, Limited
By M. A. Cawley, J. W. Jordan
"IntroductionTHE ORE PILLARS in the lower ""A"" ore body of Waite Amulet Mines, Limited, can be divided into two groups, those mined in the open by sub-level blast-hole methods, and those to be mined
Jan 1, 1955
-
Design and Implementation of a Brownfield Sag Pre-Crush Circuit
By G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Computer Control Experiments at Lake Dufault
By H. W. Smith, C. L. Lewis
"A process control computer has been installed in the Lake Dufault concentrator to: (a) control the on-stream X-ray analyzer and convert chart readings to elemental percentages, (b) calculate the flow
Jan 1, 1969
-
Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill
By Kim Le Roux
Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:
May 1, 2002
-
Diamonds in Canada*
By J. J. . BRUMMER
Kimber/ires are intrusive rocks whose main constituenr, olivine, has been altered entirely or almosr enrirely ro serpentine. Texture usually is porphyritic, superimposed upon a brecciared one. Diamond
Jan 1, 1984
-
Stirred Milling at Anglo American Platinum
By Chris Rule
This paper tells the story of the rapid commercial application of stirred milling technology at Anglo American Platinum?s many Concentrators. The first stirred mill ? a 10 000 litre IsaMillTM; the lar
Jan 1, 2012
-
Water Management Design for Cigar Lake Uranium Mine
By Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
The Ecstall Story: Engineering & Technical Service's Department
By G. Merle, David L. McKay, Elmar Randveer
"THE ENGINEERING AND TECHNICAL SERVICES department is responsible for supplying the following services:1. Administration and co-ordination of the work required for capital projects.2. Engineering, des
Jan 1, 1974
-
Kerr-Addison Mine
By J. W. Baker
"The Kerr-Addison mine is on the northeast shore of Larder Lake in the township of McGarry, District of Timiskaming, Ontario. It lies just south of the highway leading to the town of Kirkland Lake, 25
Jan 1, 1949
-
An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator
By Barun Gorain, Andy Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2002
-
Why SA Matters: Cost of Lacking Operator SA
Scope / Agenda ? What is Situation Awareness (SA)? ? Background on SA theory ? SA is critical in a wide variety of domains ? SA and human performance ? Consequences of poor SA ? Significant chal
Aug 1, 2013
-
Mass Balance Of A Grinding Circuit
By C. R. Larsen, R. G. Bradburn, A. L. Mular, B. C. Flintoff
"Following the acquisition of grinding- circuit data at Brenda Mines Limited for simulation purposes, various methods to mass balance the circuit were evaluated. Unfortunately, different answers were
Jan 1, 1976
-
Cadillac-Malartic Area, Quebec
By H. C. Gunning
DURING the past year the Cadillac-Malanie area in northwestern Quebec has been catapulted to the front as one of Canada's most active gold mining districts. Late in 1934 the area was lolling alon
Jan 1, 1937
-
Optimization of Acid Consumption for Copper Heap Leaching
By Anand Raman, Steve Dixon
"Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the
Jan 1, 2008
-
Leadership in Maintenance Best Practices - The Mining Experience
Leadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o
Aug 1, 2013