Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Beyond Mine-to-Mill - Circuit Design for Energy Efficient Resource Utilisation

    By A R. Bye

    Energy comes at great cost to our world and societies and therefore we should use it wisely and optimally. Societal pressure is enforcing this and the industry must respond by being proactive.The mine

    Jan 1, 2009

  • AUSIMM
    Paper No. 132. Milling And Treatment of Auriferous Ores in New Zealand.

    In dealing with the pulverization and treatment of auriferous ores, it may be stated that there is not one system of treatment applicable to all classes. In the southern portion of New Zealand the ore

    Jan 1, 1903

  • AUSIMM
    New Constraints on the Chemistry of Magmas and Fluids Associated with Intrusion-Related Gold Deposits

    In the past decade several significant intrusion-related gold deposits have been discovered in terranes historically exploited for tin-tungsten mineralization (eg Tintina Gold Province, Yukon and Alas

    Jan 1, 2005

  • AUSIMM
    Application of Mine Records to Reduce Project Risk During the Evaluation of Historical Goldfields

    By W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley

    The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol

    Jan 1, 2009

  • AUSIMM
    Significance of the Iron Oxide Outcrop at Mount Oxide, Queensland

    Significance of the body of iron oxide, which in part overlies as its hanging-wall the rich chalcocite ore-body at Mount Oxide, Queensland, has been variously interpreted by engineers and geologists w

    Jan 1, 1939

  • AUSIMM
    Aspects of Mining at Ok Tedi

    By Zwaan J, Kepa J

    Ok Tedi mine has become one of the major copper producers in the world. In the process of becoming of age, it overcame the challenges of operating in a locality which is young in geological terms,

    Jan 1, 1991

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972

  • AUSIMM
    Biodegradation of Manganese Dioxide by Purified Leaching Microorganisms

    By Madgwick J. C

    Four manganese dioxide leaching microorganisms, an Achromobacter spp, Aspergillus niger, Elllerobacter cloacae and Elllerobacter agglomerails were purified from sucrose enriched crude mixed cultures w

    Jan 1, 1985

  • AUSIMM
    Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.

    By Hemingway P, Boag J

    Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production o

    Jan 1, 1961

  • AUSIMM
    Commissioning of the Barrytown Ilmenite Pilot Plant

    By T Wootton

    The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced

    Jan 1, 1990

  • AUSIMM
    Washability Characteristics of the Liddell Seam

    CONTENTSSummary.Introduction.Location and Geology.Historical and Exploitation.Part 1. Washability Characteristics of the Liddell.Seam.Foybrook Open Cut, Top Bench.Sampling.Size and Ash Distribution.Wa

    Jan 1, 1954

  • AUSIMM
    Proposesd Research Laboratory at Risdon, Tasmania, for the Electrolytic Zinc Co. of Australasia Ltd.

    The development of research activities at Risdon and the implementing of a policy of instrumentation in plant processes have, in recent years, entailed a considerable increase in research staff and cr

    Jan 1, 1949

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • AUSIMM
    Drum Scrubber Design and Selection

    A model has been developed for drum scrubbing which allows selection of geometry and power input. Specific aspects considered are: Calculation of total static and operating volumes. Total residence ti

    Jan 1, 2004

  • AUSIMM
    The Testing and Evaluation of Australian Placer Deposits (a49af85e-318b-4a04-a0c2-bde102a5b398)

    Some important mineral fields are referred to in discussing the formation of placer deposits in Australia.Testing methods include boring by hand, with percussion rigs, with auger and pit digging drill

    Jan 1, 1966

  • AUSIMM
    Mining Induced Cleavage, Cleats and Instantaneous Outbursts in the Gemini Seam at Leichhardt Colliery, Blackwater, Queensland

    By Shepherd J

    Megascopic and microscopic studies of cleats and mining induced cleavage in Ihe first workings at Leichhardt Colliery reveal the presence of four distinct fracture sets. Microscopic studies confirm un

    Jan 1, 1981

  • AUSIMM
    The Maragorik Prospect, East New Britain, Papua New Guinea

    By Hayward SB, First DM

    The Maragorik Prospect represents a partially eroded Pliocene acid sulphate style epithermal gold system hosted within the Sigule Volcanics and Riet Bed sediments which is inferred to have formed

    Jan 1, 1991

  • AUSIMM
    A Statistical and Geological Review of the Zeehan Silver-Lead Mines, West Tasmania

    The Zeehan field has yielded over 190 000 tons of lead and 26,000,000 oz of silver. Moh of the production took place between the initial discovery of silver-lead ore in 1882 and 1920, and the greatest

    Jan 1, 1968

  • AUSIMM
    Implementation of Advanced Transfer Chute Designs

    By N van Aarde, B A. Moore, S van der Merwe

    Frequently materials handling operations are compromised by transfer chute problems ranging from high wear rates, blockages and ineffective loading of the downstream conveyor. This paper will present

    Aug 12, 2013

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963