Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Barrier Pillar Design for Safe and Productive Longwall MiningBy Stephen C. Tadolini
Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use
Jan 1, 2013
-
Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)By Vincent Scovazzo
Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u
Jan 1, 2002
-
Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall AreasBy Richard A. Allwes
A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano
Jan 1, 1986
-
Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface StructuresBy Yi You
A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term
Jan 1, 1997
-
The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground MovementsBy Robert W. Bruhn
A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a
Jan 1, 1990
-
Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt SystemBy John D. VandeKraats
Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su
Jan 1, 1998
-
An Examination of the Loyalhanna Limestone's Structural Features and Their Impact on Mining and Ground Control PracticesBy Tony Iannacchione
A close look at the Loyalhanna Limestone of southwestern Pennsylvania reveals a complex structural environment. Most exposures of the Loyalhanna occur along Chestnut Ridge and Laurel Hill within the A
Jan 1, 2002
-
Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete SupportsBy E. Bauer
During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc
Jan 1, 1988
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine
Jan 1, 1998
-
Design Of A Roof Truss Bolting Plan For Bear MineBy C. P. Mangelsdorf
Between June of 1975 and November of 1978 Stateham and Radcliffe of the Denver Research Center of the Bureau of Mines in cooperation with officials of the Bear Coal Company of Somerset. Colorado Condu
Jan 1, 1984
-
Management of the Dynamic Phenomena of Rock Pressure in Underground MinesBy Vladimir I. Klishin
Complex method of ruling of rock pressure is considered in conditions of rapid roof subsidence. The purpose of this method is elaboration of emergency devices into hydraulic props. Also method of unlo
Jan 1, 1997
-
Roof Bolting Application In Longwall Mining In Indonesia And JapanBy Herryal Anwar
The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that
Jan 1, 1999
-
Use Of Database In Ground Control To Identify Weightings And Water InflowsBy G. C. Xiao
A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate
Jan 1, 1990
-
Spatial Trends In Rock Strength - Can They Be Determined From Coreholes? (51393e91-3e75-4a8d-ac36-e107a993fe35)By Christopher Mark
Mine planning for a new reserve is based on information obtained from exploratory coreholes. A critical component of an exploration program is the geotechnical evaluation. Poor assumptions about roof
Jan 1, 2004
-
Development of a Six Drilhead Roof Bolting MachineBy Bill A. Kyslinger
"In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design
Jan 1, 2016
-
Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt SystemsBy Kot Unrug
The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning
Jan 1, 2004
-
Modelling Of Pillar Stability In Room And Pillar MinesBy Douglas Morrison
By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o
Jan 1, 2003
-
Determination Of Basis For The Double Use Of Rectangular Rockbolted Roadways In The D/C Seam At The Auguste Victoria MineBy Karl H. Brandt
In the Auguste Victoria mine a bolted rectangular roadway has been kept open for the first time in the seam D/C after retreat. The target of the project was to gain a basis for planning and experie
Jan 1, 2001
-
Remote Detection Of Abandoned Mine Workings Using Radio Imaging Method TechniquesBy James G. Schotsch
Unmapped abandoned mines are hazards for under¬ground mines, surface mines and surface structures. The Radio Imaging Method (RIM) provides a cross borehole technique to remotely detect abandoned mine
Jan 1, 1990
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000