Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling

    By Wei Yin, Yu Wu, Xiexing Miao

    "For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in

    Jan 1, 2015

  • SME-ICGCM
    A Review of the Geomechanics Aspects of a Double Fatality Coal Burst at Austar Colliery in NSW, Australia in April 2014

    By Bruce Hebblewhite, Jim Galvin

    "A coal burst occurred on 15 April, 2014 at the Austar Coal Mine, located west of Newcastle, NSW, Australia. The burst resulted in fatal injuries to two men working as part of the mining crew at the d

    Jan 1, 2016

  • SME-ICGCM
    Utilization of the OSI Underground System's Tandem Anchor to Improve the Weak Roof's Stability of Underground Openings

    By Tom Blevins, Roland Walker, Jinsheng Chen

    "The Dywidag-Systems International DSI Tandem Anchor bolt, with an improved expansion shell-washer design, can substantially reduce potential entry roof falls caused by twisted or deformed expansion s

    Jan 1, 2010

  • SME-ICGCM
    A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction Method

    By Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner

    "In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari

    Jan 1, 2015

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • SME-ICGCM
    Premining Stability Analysis Of A Shaft Pillar At The Homestake Mine

    By J. C. Johnson

    High-grade ore found in a shaft pillar at the Homestake Mine prompted a request for a Bureau of Mines study to determine if selected areas of the shaft pillar could be mined without jeopardizing the s

    Jan 1, 1989

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • SME-ICGCM
    Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004

    By Lewis Dr. Wade

    It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO

    Jan 1, 2005

  • SME-ICGCM
    Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment

    By Thierry Lavoie, Mark K. Larson

    "Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement

    Jan 1, 2016

  • SME-ICGCM
    Mitigation of Longwall Subsidence Effects on Operating Railroad

    By Robert Kimutis, Ke Yang, Yi Luo, Jianwei Cheng

    "Surface subsidence processes, especially those associated with a longwall mining operations, could cause operational and/or safety problems to railroads. For railroads with normal amounts of traffic,

    Jan 1, 2010

  • SME-ICGCM
    Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep Overburden

    By Joe Wickline, Mark A. Van Dyke, Wen H. Su

    "Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr

    Jan 1, 2017

  • SME-ICGCM
    Characterization of Tensile and Shear Loading on Smooth and Indented Wires and PC–strand Cable Bolts

    By Steven Derycke, Stephen C. Tadolini, Anand Bhagwat

    "The tensile and shear strength of intrinsic bolting support systems has always been a major concern of designers. A comprehensive laboratory testing program was designed to evaluate the tensile and s

    Jan 1, 2015

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Mitigating Longwall Subsidence Effects on a Large Industrial Building

    By Yi Luo

    The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ

    Jan 1, 2005

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor Tunnel

    By John Rusnak

    The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech

    Jan 1, 1998

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    A Resin Quality Testing Procedure for Collieries

    By D. Minney

    The quality of resin used in South African collieries is currently controlled according to South African Bureau of Standards, "SABS-1534:2002". It has however been found that resin which passed the SA

    Jan 1, 2005