The Green Mining Technique in Chinese CollieriesBy Minggao Qian, Jialin Xu, Wenqi Lai, Weibin Zhu
This article advances an innovative concept explaining the connotation and technical system of "green" mining. The important theoretical foundations of "green" mining are the distribution and developm
Jan 1, 2005
-
Linear Programming Optimization Of Asphalt Mix Design - Preprint 09-032By K. Awuah-Offei
The objective of asphalt mix design is to produce a mix with optimal performance using available aggregate stockpiles. Often, this process does not take into consideration aggregate plant stockpile in
Jan 1, 2009
-
Simco-Peabody Three-Mile Overland Belt System - Annual Meeting Of A.I.M.E. Dallas, TexasBy Warren C. Gerler
An overland belt conveyor system is installed for only one reason to save money. It must pay its way on a ton-mile basis over a stated period of time, and do so in competition with other forms of tran
Jan 1, 1963
-
Process Design For Control Of Sludge Production From Wet Phosphoric Acid Processing ? I. IntroductionBy Paul L. Bearden
The accumulation, handling, and utilization of sludges formed from wet process phosphoric acid is one of the major problems in the industry. The purpose of this paper is to explain some of the cons
Jan 1, 1966
-
Some Tax Considerations In Mill DesignBy G. T. Swanby
Members of AIME, I read to you now a portion of a very fine business letter which we received several years ago. This letter originated in Rangoon, Burma, and reads in part: "Rest assured, if your
Jan 1, 1965
-
Queens Bored Tunnels, East Side Access, New YorkBy David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005
-
Bucket Wheel Stacker-Reclaimers, A Survey Of Progress In The U.S.A.By W. L. Price
Since first introduced in the United States in 1964, rail mounted bucket wheel stacker-reclaimers have gained wide acceptance by users. The coal burning power plant group has adopted this new storage
Jan 1, 1969
-
Evaluation And Selection Of Coals For Metallurgical CokeBy R. F. Davis
The evaluation and selection of coals for producing metallurgical coke is indeed a com- plex process simply because coal is a complex and variable substance which is sensitive to how it is treated fro
Jan 1, 1980
-
Plant Practice in Iron Ore ProcessingBy R. Bruce Tippin
Background Iron ore is the No. 1 metal mining industry in the U.S. with dollar value of $2.3 billion in 1984 (U.S.B.M Mineral Commodity Sunnnaries , 1985). However, during the past decade this nat
Jan 1, 1986
-
Travelling In South AfricaBy F. Habashi
The Republic of South Africa is a heterogeneous mixture of Black Africans, Afrikaans, British, Indians, Malayans, French Huguenots, and many others from Europe and Asia. A decisive date in its recent
Jan 1, 2010
-
Innovations In Train And Truck Unloading TechnologyBy Paul Soros
The rationale for innovations in two directions is identified: raising capital and annual throughput, in order to avoid the cost of constructing and operating an additional system and to reduce the ca
Jan 1, 1985
-
Instrumentation And Control Of The Heavy Media Process (af095f48-8dd6-4c09-af67-6ede019aee99)By Donald G. Oss
The need for instrumentation and automatic control of the various parameters in the heavy media process of iron ore beneficiation has been apparent for some time. Continued demands for higher grade, c
Jan 1, 1962
-
The Application And Utilization Of The Enviro-Clear Thickener In A U. S. Steel Coal-Preparation PlantBy A. A. Terchick
In 1970 U. S. Steel acquired the physical assets of mine, mine property, and preparation plant of the Crystal Block Coal Company near Thacker, Mingo County, West Virginia. The facility, identified as
Jan 1, 1974
-
A 4.75m Contractor Manufactured EPB MachineBy Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008
-
Mining And Exploration Division - Shaft Design and Construction - Shaft Mining Design In Rock ? IntroductionBy Donald P. Richards
Is a shaft the same as a tunnel and can it be approached in the same manner for design and construction? The most obvious difference between a shaft and a tunnel is that of orientation; whereas a tunn
Jan 1, 1979
-
Determination Of Identicalness Levels In Availability Analysis Through Mann-Whitney U-Test For Two SamplesBy H. Ankara
Determining the identicalness levels of the same model trucks working in open pit mine transportation system by means of statistical analysis methods is very significant in terms of availability analy
Jan 1, 2010
-
Single Stage Vs Two Stage Grinding At HomestakeBy C. E. Schmidt
Homestake crushing and grinding, practice-was completely revised during the period of 1951-1953. During the conversion, both crushing plants at the head frames the Ross and the Yates, were changes at
Jan 1, 1958
-
Economics Of Fluorine Raw MaterialsBy J. K. Brooke
Fluorine is a lively element in both its chemical and economic behavior. It was not isolated as an element until 1886 by Moissan. However, its principal source to this day, fluorspar, was known and it
Jan 1, 1964
-
Progress And Problems In Combustion Of Lignite From The Northern Great Plains Area ? IntroductionBy G. H. Gronhovd
The U.S. Geological Survey estimate of the total remaining reserves of lignite in this country as of Jan. 1, 1967 was about 448 billion tons. This represents 27 percent of the total coal reserves on a
Jan 1, 1968
-
Development And Operations Of The Trombetas BauxiteBy Fulvio V. Fonseca
The Trombetas bauxite deposits were discovered by ALLAN, as from the original work of the geologists Drs. E. E. GREIG and 3.A. STAARGAARD on the axis of the Amazon river, between Manaus and Santarem -