Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
South African Gold Production: How Long the Dominant Factor?By Edward H. Jr. Boyle, Paul R. Thomas
Introduction It is estimated that nearly 40% of all the gold ever mined in free world countries has been produced by South African operations. There is concern that this immense productive capacity w
Jan 11, 1984
-
Stochastic Simulation of Geology for Uncertainty AnalysisBy V. Osterholt
Sustainable development of mineral resources is based on a spatial model of the orebody that is only partly known from exploration drilling and associated geological interpretations. As a result, oreb
Jan 1, 2005
-
Social, Economic, And Planning Impacts Of Rapid Excavation And Tunneling TechnologyBy W. L. Garrison
Improvements continue to be made in rapid excavation and tunneling technology. There are several ways to examine the impacts of such improvements. The most common procedure is to monitor current devel
Jan 1, 1974
-
Current usage of continuous monitoring systems in coal mines discussedBy Kevin G. Stricklin
Introduction Continuous monitoring techniques have been used in the US and abroad for many years. A continuous miner has a monitor that measures methane and automatically gives a warning if the metha
Jan 9, 1987
-
Mechanical Mining: Challenges and DirectionsBy Richard E. Gertsch
Mechanical mining holds great promise for the mining industry. Realizing this promise depends on developing the tools needed to mechanize a mining operation with a reasonable expectation of success.
Jan 1, 1994
-
Shaft Sinking In Difficult Ground Conditions For The LEP Project, Geneva, SwitzerlandBy F. Dieu, C. Laughton
CERN, the European Laboratory for Particle Physics, is, at present, constructing an underground tunnel and cavern network to house a Large Electron Positron (LEP) colliding beam machine. This paper
Jan 1, 1987
-
The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling ParametersBy Donald E. Raab, Lee W. Saperstein
INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be
Jan 1, 1974
-
Grinding Mill Scale-up ProblemsBy N. Arbiter, C. C. Harris
The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o
Jan 1, 1982
-
English Sea Drives - A Success StoryBy Joseph L. Margin
From a stubborn start to record setting performances in little over a year, that is the story of the English Running Tunnel Boring Machines. The program to transfer technical information on these high
Jan 1, 1991
-
Real-time assisted driving in openpit mining operations using Google EarthBy Antonio Nieto
According to the analysis of surface powered haulage accidents involving off-highway haul trucks in openpit mining, the U.S. Mine Safety and Health Administration (MSHA), reported 1,300 fatal accident
Jan 2, 2010
-
Case studies illustrate the need for a new concept of coal pillar designBy Syd S. Peng
Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust
Jan 11, 1986
-
Factors Affecting The Location Of The Neutral Point In Ventilation Systems (4b1f3a2d-a6d9-44c2-9c56-0100dbf7a4af)By J. M. Wempen
Booster fans in underground coal mines are often located using the concept of a neutral point. Normally, intake airways are maintained at higher absolute pressure than return airways, so air leaks fro
Jan 1, 2012
-
How Blasthole Shock Absorbers Reduce CostsBy Jack T. Work
Spiraling costs in every segment of the open-pit mining cycle is a fact of life that every operator must reckon with. The introduction of various shock absorbing devices for rotary drilling is one rec
Jan 4, 1980
-
The Expectations For Coal: Is Our Government And The Coal Industry Prepared?By M. S. Miller
With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding
Jan 1, 2004
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build ContractBy David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”By J. R. Piper
“Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e
Jan 1, 2001
-
Investigation and Abatement of Subsidence Damage at the Heltsley Residence, IndianaBy Robert A. Cummings, Madan M. Singh
In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and
Jan 1, 1986
-
Hydraulic Considerations For Leaching OperationsBy J. F. Lupo
Leaching operations combine both metallurgical and hydraulic processes to extract metals from the ore heap. In the design of leaching operations, metallurgical tests and simple hydraulic tests are oft
Jan 1, 2000
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Rock Fall Control In Surface Mining With Cable & Ring Net FencesBy C. O. Brawner, J. Kalejta II
The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen
Jan 1, 2002