Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Penetration Analysis of a Shaped Charge Jet into a Concrete Target

    By Joseph Indeck, Seokbin Lim, Andrew Thompson

    In the design of explosively driven penetration devices, understanding the impact conditions between the explosively propelled penetrator and the target is one of the most important steps in optimizin

    Jan 1, 2011

  • ISEE
    Port of Miami Project – Protecting Marine Species During Underwater Blasting

    By Terri Jordan, Kenneth Hollingshead, Mary Jo Barkaszi

    The Port of Miami, Miami-Dade County, Florida (Port) is the largest container port in the State of Florida. However, it is located in the center of a diverse ecosystem. Biscayne Bay surrounds the Port

    Jan 1, 2007

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition

    By David Harrison

    The Charleroi Locks and Dam (Figure 1) was completed in 1932 and is located on the Monongahela River, approximately 22 miles (35 km) south of Pittsburgh, in Charleroi, Pennsylvania. It is comprised of

    Jan 1, 2015

  • ISEE
    Pole Hole Blasting in Central Washington State

    By Bill Paysse, Lyle Ruffle

    My intention is to produce a video, pictorial, and oral presentation on utility blasting, primarily power pole holes and ditches. Included will be blasting for a take-off structure inside of Wanapum s

    Jan 1, 2007

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis

    By K. M. Kim, J. B. Kemeny

    A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main

    Jan 1, 2011

  • ISEE
    Instrumentation and Monitoring Criteria to Determine Structural Response from Blasting

    By H Y. Fang, H Sutherland, R M. Koerner

    Due to the increased number of complaints by property owners to blasting related industries an apparent need for a clearer understanding of blasting-related damage is needed. We feel that direct struc

    Jan 1, 1976

  • ISEE
    Blasting for the Enhanced Western Groundwater Extraction System - Modern Landfill

    By Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron

    In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove

    Jan 1, 2001

  • ISEE
    The Effects of Fault Planes on the Propagation of Vibration Waves

    By Abdulkadir Karadogan, Zikri Keti, Umit Ozer, Mehmet Aksoy, Ulku Kalayci

    This paper presents an investigation about how the motions of blast induced vibration waves were affected by the presence of the fault planes. This study was carried out at Espey Open- Pit Boron (Cole

    Jan 1, 2012

  • ISEE
    Blast Damage Claims Evaluation and The Small Engineering Firm

    By Mark A. Rugen

    It may be difficult to imagine but small engineering companies do exist, even in relatively large cities like San Antonio. Due to the limited capital available for the purchase or use of equipment suc

    Jan 1, 1983

  • ISEE
    Ten Year US Eleven State Study of Blasting Damage Claims

    By Eric Grigoryan, Wade Hutchison

    An engineering study of 2,250 blasting damage claims from 1999 to 2008 in Tennessee, Kentucky, Virginia, Nevada, California, Georgia, South Carolina, North Carolina, Alabama, Arizona and Utah were inv

    Jan 1, 2009

  • ISEE
    Ground Vibration Attenuation Rate due to Blasting in South Florida

    By Sharkey Bowers

    This study was undertaken in order to determine a conservative estimate of the attenuation rate of vibrations through the shallow limestone in South Florida due quarry blasting. The natural limestone

  • ISEE
    A Case Study - Interpretation of Fragmentation Analysis Results to Improve Blast Performance and Realize Significant Cost Savings

    By Charles Clark, Mark Mukhija, Jaime Klein

    Comminution – the reduction in size of solid materials – is the most energy intensive component of the mining process (Bauer, 2015). It is estimated that comminution consumes around three percent of a

    Jan 1, 2018

  • ISEE
    Working With Explosives Suppliers to Optimize Pit Productivity and Costs

    By Thomas J. Snyder

    Modern quarry management should be alert to every opportunity to improve productivity and reduce operating costs. In this paper, the author outlines areas in which explosives suppliers should be encou

    Jan 1, 1988

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • ISEE
    New Firing Method for Underwater Blasting (Remote-Controlled Blasting System by Electromagnetic Firing Method)

    By Takeo Ueda, Masashi Nakano

    We have developed a new blasting system remotely controlled by an electromagnetic firing method, which has proved advantageously applicable to sites where rapid tidal current or deep water may cause s

    Jan 1, 1983

  • ISEE
    Potential Applications of Ultra High Intensity Blasting, UHIB

    By Egonk Arriagada, Jair Alarcon

    The efficient use of energy in the ore comminution process is an increasingly important strategic issue for improving the productivity and competitiveness in the mining industry as is in recent years

    Jan 1, 2015

  • ISEE
    Safety in the Industry: Recent Development in the Classification of Eexplosives Precursors – The Modified Vented Pipe Test

    By David Kennedy, Noel Hsu, Miguel Araos

    The use of bulk explosive for mining applications started in the 50’s. Since then millions of tons of that material have been transported by road. However during that time, there have been several roa

    Jan 1, 2006

  • ISEE
    Strategy, Innovation and Change - Challenging the Future at the Gregg River Mine

    By Rick W. Bellenie, Ronald L. Woolf

    The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.

    Jan 1, 1994

  • ISEE
    Design Criteria for Sequential Blasting

    By A B. Andrews

    The use of sequential blasting techniques that combine surface and in-thehole delays has provided blasters with increased flexibility in blast design to promote good rock fragmentation and displacemen

    Jan 1, 1981