Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro

    By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani

    "CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t

    Jan 1, 2017

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd

    Jan 1, 1990

  • DFI
    A Need To Reevaluate Attitudes In Engineering And Construction

    By d&apos, E. Appolonia

    A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Con­tractors, engineers, suppliers and equipment developers

    Jan 1, 1985

  • DFI
    Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System

    By Stephan Großwig, Karolina Nycz, Arne Kindler

    "Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu

    Jan 1, 2017

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • DFI
    Experiences With A New Type Of Displacement Screw Pile - Synopsis

    By William Van Impe

    A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a

    Jan 1, 1996

  • DFI
    Micropiles To Support Electric Power Transmission Towers

    By Wendy L. Mathieson

    The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta

    Jan 1, 2004

  • DFI
    111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UK

    By Shane Baker

    Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl

    Jan 1, 2006

  • DFI
    Effective Analysis Of Soil-Pile Interaction Under Dynamic Loads

    By Inn-Joon Park

    Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist

    Jan 1, 2002

  • DFI
    Rigid Inclusions For Soil Improvement In A 76 Building Complex

    By Walter I. Paniagua

    A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl

    Jan 1, 2008

  • DFI
    Measured And Predicted Response Of Laterally Loaded Piles - Synopsis

    By K. Mallikarjuna Rao

    There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction

    Jan 1, 1996

  • DFI
    Conventional And Box-Shaped Piled Rafts

    By Heinz Brandl

    Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The

    Jan 1, 2002

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • DFI
    Little Britain Project: Construction Of Basement

    By R. H. Wright

    This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac

    Jan 1, 1989

  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • DFI
    Oakland Airport Roadway Project - Synopsis

    By David S. Yang

    The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc

    Jan 1, 2001

  • DFI
    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI